A Study of Lean Construction Practices in Gaza Strip
A Study of Lean Construction Practices in Gaza Strip
A Study of Lean Construction Practices in Gaza Strip
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure (4.15) shows the average <strong>of</strong> percent plan complete is smaller than 80% which<br />
requires f<strong>in</strong>d<strong>in</strong>g out failure reasons <strong>in</strong> each week. By the application <strong>of</strong> the five why<br />
tools and the 10 po<strong>in</strong>ts described <strong>in</strong> part (3.3).<br />
0.9<br />
0.8<br />
0.7<br />
0.6<br />
0.5<br />
0.4<br />
0.3<br />
0.2<br />
0.1<br />
0<br />
w eekly percent plan complete Average percent plan complete<br />
Week 1 Week<br />
2<br />
Week<br />
3<br />
Week<br />
4<br />
Week<br />
5<br />
Week<br />
6<br />
Week<br />
7<br />
Week<br />
8<br />
Week<br />
9<br />
Week<br />
10<br />
Figure 4.15 Average percent plan complete <strong>of</strong> each four week<br />
81<br />
Week<br />
11