20.02.2013 Views

EPA's Vessel General Permit and Small Vessel General

EPA's Vessel General Permit and Small Vessel General

EPA's Vessel General Permit and Small Vessel General

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Discharges not Evaluated in the BE. EPA’s decision process identified a number of discharges<br />

that would not be evaluated in the BE dues to the relative number of vessels releasing the<br />

discharge, the volume of the discharge, <strong>and</strong>/or the potential risk posed by the concentration <strong>and</strong><br />

constituents of that discharge. Table 23 summarizes each discharge not evaluated in the BE <strong>and</strong><br />

EPAs decision process for each. Details on discharge estimates <strong>and</strong> other information EPA used<br />

in arriving at these decisions are provided in footnotes to table 3-3 in the BE.<br />

258

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!