I-60 Lmqitudinal CrackFnq - l988<br />

in Jme 3, 1988 project PZrSmnd m 35-tnileS Of a yet-to-be owed to traffic<br />

sectian of I-61 noted Some lmgitudinal Cracking m both sides of tfie<br />

transverse mtractim joints in the portland cement ancrete (pee) <strong>pavement</strong>.<br />

At first, the lmgitudinal aaching appeared to be limited to a carple of<br />

interchange ranps, however, it was swn fovld to be scattered throu#xut the<br />

approximately eleven miles of pet <strong>pavement</strong> having w shoulders. The omer 24<br />

miles of yet-to-k opened section of I-61 consisting of pee pavenent having<br />

asphalt stroulders was not experiencing any cradling. The cracks were<br />

typically 12-18 inches in length and were located approximately 9-12 in&es<br />

from the mainline/shoulder joint. wlen cracking octlPled, me cracks wcTe<br />

ahays present m both sides of the transverse cmtractim joint and near the<br />

inside and cutside of the nU.rUne/shoulder 1mgitudina.l joints.<br />

BACKGROUND<br />

The eleven miles of WC pavenent were placed in 1987 ulder 3 paving projects<br />

involving two cmtractors. me mainline pee consists of l2-indr jointed,<br />

mesh-reinforced concrete <strong>pavement</strong> having 40.foot joint spacing. The typical<br />

sectim consists of two travel lanes with an additlmal truck cllnbing lane<br />

for several sectims. The tied sharlders ansist of 10.in* ncn-reinforced<br />

ccncrete <strong>pavement</strong> having 200taot joint spacing. The shoulders art tied to the<br />

mainline <strong>pavement</strong> with had< bolts. Free draining base material consisting of<br />

qgregate (No. 57 stme) treated with two percent of paving asphalt by wei@<br />

’ the aaregate is in place breath the mainline and shoulder pee <strong>pavement</strong>.<br />

bgitudinal and transverse joints were sawed and sealed using a low module<br />

Aliccnc seaLant. This section of I-64 was scheduled to be opened to traffic<br />

on July 15 so it was tiperatfve.mat me cause of me prcblem be cktermined<br />

and an acceptable solution fomd before the road was opened.<br />

<strong>On</strong> Jcne 6, Messrs. W.T. KeUey, D.M. Hart and D.J. VoeU