24.03.2013 Views

chapter 3 rigid pavement - DOT On-Line Publications - Department ...

chapter 3 rigid pavement - DOT On-Line Publications - Department ...

chapter 3 rigid pavement - DOT On-Line Publications - Department ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12.<br />

Requirements for steam cure method:<br />

FHWA TECHNICAL ADVISORY T 5080.17<br />

July 14, 1994<br />

ATTACHMENT 6<br />

(a) Three (3) recording thermometers available<br />

(b) Temperature record charts<br />

(cl Adequate temperature control valves<br />

(1) What are the increments of spacing of control<br />

valves?<br />

13. Are facilities available for proper protection and<br />

handling of component materials in storage? (Rate<br />

0S*8 if satisfactory, "U'* if unsatisfactory, and<br />

I*NA** if not applicable)<br />

14.<br />

15.<br />

(a) Wire and/or strand<br />

lb) Reinforcina steel<br />

id Structural-steel<br />

.(d) Cement<br />

W Coarse Aggregate<br />

(f) Sand . ; ._.%<br />

Is there a suitable shelter (at least 14 square<br />

meters floor space,- facilities for lights, heat,<br />

desk(s), etc.) available for the inspector's use?<br />

Personnel present during inspection of plants:<br />

Producers/Contractors Highway <strong>Department</strong><br />

3.10.49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!