F?iWA TECtiICAL ADVISORY T 5080.17<br />
July 14, 1994<br />
ATTACHMENT I<br />
(3) Mixers are to be examined periodically to<br />
detect changes in condition due to<br />
accumulation of hardened concrete or blade<br />
wear. A copy of the manufacturer's design,<br />
showing dimensions and arrangements of<br />
blades, should be available at the plant at<br />
all times.<br />
B. Truck Mixers<br />
4. Weather<br />
(1)<br />
(2)<br />
(3)<br />
(4)<br />
A.<br />
(I)<br />
(2)<br />
- B.<br />
(1)<br />
Mixers should be equipped with a metal plate<br />
that indicates mixing speed, capacity, mixing<br />
revolutions, agitating speed and agitating<br />
capacity.<br />
Mixers should be equipped with a revolution<br />
counter.<br />
Mixers are to be examined to determine<br />
satisfactory interior condition, that is, no<br />
appreciable accumulation of hardened concrete<br />
and no excessive blade wear. A copy of the<br />
manufacturer's design, showing dimensions and<br />
arrangements of blades, should be available<br />
at the plant at all times.<br />
Charging and discharge openings and chutes<br />
should be in good condition.<br />
Hot Weather<br />
When concreting during hot weather, is plant<br />
equipped to cool ingredients? Is equipment<br />
available to produce acceptable ice?<br />
How are aggregates cooled? If by sprinkling,<br />
is provision made to account for excessive<br />
water?<br />
Cold Weather<br />
When concreting during cold weather, is plant<br />
equipped to heat ingredients to produce<br />
concrete of applicable minimum temperature.<br />
3.10.28