24.03.2013 Views

chapter 3 rigid pavement - DOT On-Line Publications - Department ...

chapter 3 rigid pavement - DOT On-Line Publications - Department ...

chapter 3 rigid pavement - DOT On-Line Publications - Department ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FHWA TECHNICAL ADVISORY T 5080.17<br />

July 14, 1994<br />

ATTACHMENT 6<br />

CHECKLIST FOR QUALIFICATION OF FACILITIES<br />

FOR PRESTRESSED CONCRETE PRODUCTION<br />

1. Items which require written approval:<br />

applicable blanks)<br />

(a) Plans and computations of facilities<br />

(check<br />

(b) Concrete mix design (should include curves<br />

for 28-day strength) vs W/C Ratio:<br />

(cl<br />

(d)<br />

(e)<br />

IfI<br />

(g)<br />

Curing method<br />

Epoxy-sand mortar, if used<br />

Coal tar epoxy, if used<br />

Water reducer-retarder<br />

Design Engineer should be approved by State<br />

<strong>DOT</strong><br />

(h) Gauge calibration should be certified<br />

ci, Computations regarding beam tests (2 weeks<br />

prior to testing)<br />

2. What is length and capacity of stressing bed(s)<br />

Bed No.<br />

Bed No.<br />

Bed No.<br />

Length<br />

Length<br />

Y Length<br />

Capacity<br />

Capacity<br />

Capacity<br />

3. Procedure of prestreasing (pretensioning) and stress<br />

release:<br />

.*. -<br />

(a) Jacks, carriages, and struts are adequate to<br />

attain and maintain design stress.<br />

Yes No<br />

Comments:<br />

3.10.4s

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!