24.03.2013 Views

chapter 3 rigid pavement - DOT On-Line Publications - Department ...

chapter 3 rigid pavement - DOT On-Line Publications - Department ...

chapter 3 rigid pavement - DOT On-Line Publications - Department ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FHWA TECHNICAL ADVISORY T 5080.14<br />

June 5, 1990<br />

Attachments<br />

the design requirements. Longitudinal joints should be sawed<br />

as early as possible to prevent random cracking. This is<br />

especially .true in multi-lane construction. Sawing should not<br />

begin until the concrete is strong enough to prevent raveling.<br />

e. Asphalt concrete patches are not recommended as a temporary or<br />

a permanent repair technique because they break the continuity<br />

of the CRCP and provide no load transfer across the joint.<br />

Anthony R. Kane<br />

Associate Administrator for Engineering<br />

and Program Development<br />

3.6.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!