FWA TECHNICAC ADVISORY T 5080.17<br />
July 14, 1994<br />
ATTACHMENT 1<br />
2.<br />
C. Water<br />
(1) Does the plant have an adequate water supply<br />
with pressure sufficient to prevent<br />
interference with accuracy of measurement?<br />
(2) Is there any evidence or history of<br />
contaminants in supply?<br />
D. Liquid Admixtures<br />
(1) Is there evidence of source approval?<br />
(2) Is the admixture and dispensing equipment<br />
protected from freezing, contamination, or<br />
dilution?<br />
(3) How often<br />
dispensing<br />
are the admixture metering and<br />
equipment periodically cleaned?<br />
Batchina Rcnynmenf<br />
.<br />
A. Scales<br />
JS)<br />
(1)<br />
(2)<br />
(3)<br />
(4)<br />
(6)<br />
Scales should indicate weight by means of a<br />
beam with balance indicator, full range dial,<br />
or digital display.<br />
For all types of batching systems the<br />
weighing devices must be readable by the<br />
batchman and the inspector from their normal<br />
stations.<br />
Scales should be certified or should be<br />
calibrated with a certified scale.<br />
Ten 25 kilogram test weights should be<br />
available at the plant at all times.<br />
Scale accuracy should generally be within<br />
plus or minus .4 percent of the scale<br />
capacity.<br />
Water meters will need to be calibrated to 1<br />
percent of total added amount.<br />
3.10.26