FWA TECHNICAC ADVISORY T 5080.17<br />

July 14, 1994<br />

ATTACHMENT 1<br />

2.<br />

C. Water<br />

(1) Does the plant have an adequate water supply<br />

with pressure sufficient to prevent<br />

interference with accuracy of measurement?<br />

(2) Is there any evidence or history of<br />

contaminants in supply?<br />

D. Liquid Admixtures<br />

(1) Is there evidence of source approval?<br />

(2) Is the admixture and dispensing equipment<br />

protected from freezing, contamination, or<br />

dilution?<br />

(3) How often<br />

dispensing<br />

are the admixture metering and<br />

equipment periodically cleaned?<br />

Batchina Rcnynmenf<br />

.<br />

A. Scales<br />

JS)<br />

(1)<br />

(2)<br />

(3)<br />

(4)<br />

(6)<br />

Scales should indicate weight by means of a<br />

beam with balance indicator, full range dial,<br />

or digital display.<br />

For all types of batching systems the<br />

weighing devices must be readable by the<br />

batchman and the inspector from their normal<br />

stations.<br />

Scales should be certified or should be<br />

calibrated with a certified scale.<br />

Ten 25 kilogram test weights should be<br />

available at the plant at all times.<br />

Scale accuracy should generally be within<br />

plus or minus .4 percent of the scale<br />

capacity.<br />

Water meters will need to be calibrated to 1<br />

percent of total added amount.<br />

3.10.26