8. TEMPERATURE CONTROL<br />

FHWA TECHNICAL ADVISORY T 5080.17<br />

July 14, 1994<br />

ATTACHMENT 2<br />

Are proper precautions being taken for hot and cold<br />

weather concrete?<br />

If outside temperatures warrant it, are temperature<br />

checks of the plastic concrete being taken?<br />

9. TIME OF HAT&<br />

Is all concrete that is being hauled in truck mixers<br />

being deposited within 90 minutes from the time stamped<br />

on the tickets?<br />

If central-mixed concrete is hauled in nonagitor<br />

trucks, is the concrete being deposited within<br />

30 minutes?<br />

10. REVOLUTIONS<br />

Have 70 to 100 mixing revolutions at mixing speed been<br />

put .on the truck at the required speed (6-18 RPM)?<br />

Have 30 mixing .revolutions been placed on the truck at<br />

the required speed (e-18 RPM) after water has been<br />

added at the site?<br />

Is the agitating speed between 2-6 RPM?<br />

Are total number of revolutions being limited to 3001<br />

11. CONCRETE DEWVERY TICKa<br />

Are all truck tickets being properly completed,<br />

collected, and retained?<br />

12. WATER CONTROL<br />

Is all water that is being added to the mix accounted<br />

for and checked to ensure the w/c ratio is not<br />

exceeded? .- -<br />

Are air content tests being performed according to the<br />

required frequency?<br />

3.10.31