8. TEMPERATURE CONTROL<br />
FHWA TECHNICAL ADVISORY T 5080.17<br />
July 14, 1994<br />
ATTACHMENT 2<br />
Are proper precautions being taken for hot and cold<br />
weather concrete?<br />
If outside temperatures warrant it, are temperature<br />
checks of the plastic concrete being taken?<br />
9. TIME OF HAT&<br />
Is all concrete that is being hauled in truck mixers<br />
being deposited within 90 minutes from the time stamped<br />
on the tickets?<br />
If central-mixed concrete is hauled in nonagitor<br />
trucks, is the concrete being deposited within<br />
30 minutes?<br />
10. REVOLUTIONS<br />
Have 70 to 100 mixing revolutions at mixing speed been<br />
put .on the truck at the required speed (6-18 RPM)?<br />
Have 30 mixing .revolutions been placed on the truck at<br />
the required speed (e-18 RPM) after water has been<br />
added at the site?<br />
Is the agitating speed between 2-6 RPM?<br />
Are total number of revolutions being limited to 3001<br />
11. CONCRETE DEWVERY TICKa<br />
Are all truck tickets being properly completed,<br />
collected, and retained?<br />
12. WATER CONTROL<br />
Is all water that is being added to the mix accounted<br />
for and checked to ensure the w/c ratio is not<br />
exceeded? .- -<br />
Are air content tests being performed according to the<br />
required frequency?<br />