16. THICKNESS TEST<br />
FHWA TECHNICAL ADVISORY T 5080.17<br />
July 14, 1994<br />
ATTACHMENT 3<br />
IS the thickness of the <strong>pavement</strong> being checked?<br />
17. AIR CONTENT<br />
Is the air content being tested as required by the<br />
frequency chart?<br />
18. SLUMP<br />
Is the slump being checked as required by the frequency<br />
chart?<br />
19. REINFORCEMENT, DOWEL. AND TIE BAR DEPTH CHECKS<br />
Is the concrete being probed to check the vertical and<br />
horizontal positioning of the <strong>pavement</strong> reinforcement,<br />
dowels, and tie bars?'<br />
-<br />
20. STRENGTH _ -: _., '^ -+.- __- -.<br />
. . .<br />
Are $est specimens being cast at the site of work at<br />
the required frequency:<br />
.<br />
-- ..ta.l. .at: Il$ast pne-set--per da;<br />
(b) one set for-every 150 meters of two lane<br />
<strong>pavement</strong> (300 meters of one lane--<strong>pavement</strong>)<br />
21. LONGITUDINAL JOINT<br />
,<br />
(a) .. &e tie-bar? placed properly?<br />
(b) Are'the~jbints sawed at the same time as the<br />
transverse joints with <strong>pavement</strong> widths<br />
greater than 7.3 meters? Are they cleaned<br />
and immediately filled with sealer?<br />
22. TRANSVERSE . '-<br />
.-. a (a) Are the smooth dowel bars positioned parallel<br />
to the grade at a depth of t t:<br />
Are the dowel bars coated with a thin bond<br />
breaker?<br />
Are the capped ends of the bar coated with a<br />
debonding agent? '-(Expansion joints)<br />
3.10.37