BXAHPLB B:<br />
The State elects to change their design by reducing.the joint<br />
spacing to 30 feet.<br />
Step 1 - Determine the anticipated joint movement.<br />
AL is directly proportional to L;<br />
decreases AL by 50 percent.<br />
AL= 0.15 inch<br />
Step 2 - Select width of uncompressed seal.<br />
decreasing L by 50 percent<br />
w 2 AL + (C, - C,)<br />
> 0.15 f ( 0.55 - 0.20 )<br />
2 0.15 i 0.35<br />
2 0.43 inch<br />
use W = 0.688 inch ( a larger size than necessary )<br />
Step 3 - Select width of sawcut.<br />
PC = c* + Install temr, - Min temx,<br />
1<br />
C Maximum temp - Min temp<br />
Sc=(1-Pc)*W<br />
Case 1: Installation temperature = 80'F<br />
* (%a - Gin)<br />
PC = 0.2 + [ ( 66 i- 76 ) * ( 0.55 - 0.2 ) ]<br />
= 0.2 + ( 0.87 ) * ( 0.35 )<br />
= 0.50<br />
SC =(l- 0.5 ) * 0.688<br />
= 0.344 inch<br />
Case 2: Installation temperature = 40-F<br />
PC = 0.2 + [ ( 26 + 76 ) * ( 0.55 - 0.2 ) ]<br />
- 0.'2 + ( 0.34 ) * ( 0.35 )<br />
= 0.32<br />
SC =(l- 0.32 ) * 0.688<br />
= 0.47 inch<br />