BXAHPLB B:<br />

The State elects to change their design by reducing.the joint<br />

spacing to 30 feet.<br />

Step 1 - Determine the anticipated joint movement.<br />

AL is directly proportional to L;<br />

decreases AL by 50 percent.<br />

AL= 0.15 inch<br />

Step 2 - Select width of uncompressed seal.<br />

decreasing L by 50 percent<br />

w 2 AL + (C, - C,)<br />

> 0.15 f ( 0.55 - 0.20 )<br />

2 0.15 i 0.35<br />

2 0.43 inch<br />

use W = 0.688 inch ( a larger size than necessary )<br />

Step 3 - Select width of sawcut.<br />

PC = c* + Install temr, - Min temx,<br />

1<br />

C Maximum temp - Min temp<br />

Sc=(1-Pc)*W<br />

Case 1: Installation temperature = 80'F<br />

* (%a - Gin)<br />

PC = 0.2 + [ ( 66 i- 76 ) * ( 0.55 - 0.2 ) ]<br />

= 0.2 + ( 0.87 ) * ( 0.35 )<br />

= 0.50<br />

SC =(l- 0.5 ) * 0.688<br />

= 0.344 inch<br />

Case 2: Installation temperature = 40-F<br />

PC = 0.2 + [ ( 26 + 76 ) * ( 0.55 - 0.2 ) ]<br />

- 0.'2 + ( 0.34 ) * ( 0.35 )<br />

= 0.32<br />

SC =(l- 0.32 ) * 0.688<br />

= 0.47 inch<br />