FHWA TECHNIC= ADVISORY T 5080.17<br />
July 14, 1994<br />
ATTACHMENT 2<br />
14.<br />
15.<br />
16.<br />
17.<br />
18.<br />
19.<br />
20.<br />
SLUMP TEST<br />
Are slump tests bring performed according'to the<br />
required frequency?<br />
STRENGTH TEST<br />
Are concrete test specimens being cast at the-site of<br />
work as per the required frequency?<br />
PLACING CONCRETE<br />
Is the concrete being deposited as near its final<br />
position as possible? CMoving concrete horizontally<br />
with vibrators is not permitted.)<br />
Is the concrete being bucketed, belt conveyed, pumped,<br />
or otherwise placed in such a manner as to avoid<br />
segregation and is not being allowed to drop more than<br />
1.2 meters?<br />
CONSOLIDATION<br />
Is all the concrete being consolidated with hand<br />
operated spud vibrators while it is being placed?<br />
FINISHING (DECKSL<br />
Is a finishing machine (having at least one<br />
reciprocating, nonvibratory screed operating on rails<br />
or other supports) being used to strike off and screed<br />
the bridge deck?<br />
STRAIGHTEDGE TESTING AND SURFACE CORRECTION (DECKL<br />
Is the plastic concrete being tested for trueness with<br />
a 3 meter straightedge held in contact with the slab in<br />
successive positions parallel to the centerline?<br />
Are all depressions being immediately filled and all<br />
b&gh areas being cut down and refinished?<br />
SURFACE TEXTURING<br />
1s the deck surface being textured with either a burlap<br />
drag or an artificial turf drag followed by tining with<br />
a flexible metal comb?<br />
3.10.32