FHWA TECHNICAL iiDVISORY T 5080.17<br />
July 14, 1994<br />
ATT~Pr’THF?CT 3<br />
5.<br />
6.<br />
7.<br />
8.<br />
9.<br />
10.<br />
11.<br />
SUBBASE THICKNESS TEST<br />
After trimming, is the thickness of the subbase being<br />
checked?<br />
CRAINAGF,<br />
Is the subgrade being kept drained during all<br />
operations? Are all berms of earth deposited adjacent<br />
to the grade being kept drained by cutting lateral<br />
ditches through the berms?<br />
LUG SYSTEMS (CONTINUOUSLY REINFORCED)<br />
If concrete lug end anchorages are specified, are they<br />
staked and checked for dimensions and re-bar placement<br />
as shown in the plans?<br />
Are they constructed of Structural Concrete at least<br />
24 hours prior to <strong>pavement</strong> construction?<br />
LONGITUDINAJ, JOINT KEYWAY AND BARS<br />
Are the beginning and ending stations marked where<br />
adjacent curb, median, or <strong>pavement</strong> will.necessitate the<br />
placement of keyway and/or bars in the edge of the<br />
proposed <strong>pavement</strong>?<br />
SUPERELEVATION STAKING<br />
Are the plan curb data examined for all curves to<br />
determine where to stake the beginning and ending<br />
stations for a&l superelevation transitions?<br />
TEMPERATZTRE TJMITATIONS<br />
Does the outside air temperature in the shade meet<br />
State specifications?<br />
Does the temperature of the concrete meet State<br />
smcifications at the time of placement?<br />
REINFORCEMENT TAPPING<br />
Are the locations and lengths of lap for bar or fabric<br />
reinforcement in conformance with the specifications.<br />
Are all bar and fabric laps being tied?<br />