26.03.2013 Views

Code of Practice for the Electricity (Wiring) Regulations - 2009 Edition

Code of Practice for the Electricity (Wiring) Regulations - 2009 Edition

Code of Practice for the Electricity (Wiring) Regulations - 2009 Edition

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

will have affected <strong>the</strong> results <strong>of</strong> <strong>the</strong>se tests and inspections during this<br />

period.<br />

(3) Items to be inspected and tested<br />

List <strong>of</strong> items to be inspected and tested <strong>for</strong> initial tests and periodic tests<br />

are shown in <strong>Code</strong> 22D.<br />

(4) Related ordinance and regulations to be observed<br />

O<strong>the</strong>r statutory requirements in relation to electrical installations should<br />

also be referred to during <strong>the</strong> inspection, including in particular:<br />

(a) (i) Fire Services Ordinance,<br />

(ii) Fire Services (Installations and Equipment) <strong>Regulations</strong>,<br />

(b) (i) Fire Safety (Commercial Premises) Ordinance,<br />

(ii) Fire Safety (Buildings) Ordinance,<br />

(c) (i) Factories and Industrial Undertakings Ordinance,<br />

(ii) Factories and Industrial Undertakings (<strong>Electricity</strong>) <strong>Regulations</strong>,<br />

(iii) Construction Sites (Safety) <strong>Regulations</strong>,<br />

(iv) Factories and Industrial Undertaking (Work in Compressed Air)<br />

<strong>Regulations</strong>,<br />

(v) Factories and Industrial Undertakings (Spraying <strong>of</strong> Inflammable<br />

Liquid) <strong>Regulations</strong>,<br />

(vi) Factories and Industrial Undertakings (Cargo and Container<br />

Handling) <strong>Regulations</strong>,<br />

(d ) (i) Dangerous Goods Ordinance,<br />

(ii) Dangerous Goods (General) <strong>Regulations</strong>.<br />

(5) Energisation <strong>of</strong> installation <strong>for</strong> testing purposes<br />

To energise an installation or part <strong>of</strong> it <strong>for</strong> testing by a registered<br />

electrical worker prior to <strong>the</strong> issue <strong>of</strong> <strong>the</strong> relevant certificate is acceptable.<br />

(6) Standard symbols to be used<br />

Standard symbols to Appendix 8 should be used in schematic diagrams<br />

where appropriate.<br />

140

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!