02.05.2013 Views

The Vertical Sky Software Manager User Guide - MKS

The Vertical Sky Software Manager User Guide - MKS

The Vertical Sky Software Manager User Guide - MKS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Integrated Version Control<br />

member specifies the member you want to check in, for<br />

example, demoapp.ico<br />

Note<br />

If you are using PointBase database, limit the revision description to a<br />

maximum of 500 words. If you are using Oracle database, limit your<br />

revision description to a maximum of 4,000 characters.<br />

V<strong>Sky</strong> <strong>Software</strong> <strong>Manager</strong> confirms the member is checked in.<br />

To verify the member is added to the issue’s change package, use<br />

the si memberinfo command.<br />

To add a member to an issue’s change package upon locking<br />

the member using the graphical user interface<br />

1 With a Sandbox window open, select one or more members to<br />

lock.<br />

2 Choose Member > Lock, or click .<br />

<strong>The</strong> Lock Member Revision dialog box appears.<br />

Note<br />

:member appears in the Revision field to indicate the member revision<br />

will be locked.<br />

3 From the Change Package list, select a change package to<br />

associate the member with, for example, 7: Floating tool bar<br />

does not anchor to application.<br />

202 > > > > > > > > > > > > > >

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!