02.05.2013 Views

The Vertical Sky Software Manager User Guide - MKS

The Vertical Sky Software Manager User Guide - MKS

The Vertical Sky Software Manager User Guide - MKS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

For available locking<br />

options, see “Locking a<br />

Member” on page 89.<br />

Adding Members to an Issue’s Change Package<br />

4 To lock the revision and add it to the issue’s change package,<br />

click OK (for multiple members, click OK to All). To cancel the<br />

operation, click Cancel.<br />

<strong>The</strong> member is locked and added to the issue’s change<br />

package. <strong>The</strong> issue’s ID appears in the member’s C.P. ID<br />

column after the check in.<br />

To add a member to an issue’s change package upon locking<br />

the member using the the command line interface<br />

Use the si lock command, for example:<br />

si lock --sandbox=value --revision=value<br />

--changePackageId=value member<br />

where<br />

--sandbox=value specifies the sandbox containing the<br />

member you want to lock, for example, c:/sandboxdemo/<br />

project.pj<br />

--revision=value specifies the revision number you want to<br />

lock, for example, 1.2<br />

--changePackageId=value specifies the ID of the change<br />

package to associate the member with, for example, 7<br />

member specifies the member you want to lock, for example,<br />

demoapp.ico<br />

V<strong>Sky</strong> <strong>Software</strong> <strong>Manager</strong> confirms the member is locked.<br />

To verify the member is added to the issue’s change package, use<br />

the si memberinfo command.<br />

> > > > > > > > > > > > 203

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!