4.18 Findings<br />

Table 4.29: Infrastructure and Consumption<br />

Sl. No. Item Coastal<br />

Andhra<br />

Rayalaseema Telangana<br />

1 Power consumption<br />

18430 9679 30949<br />

2 Low voltage consumption in Million Units(MUs) 10418 6132 18342<br />

3 Agricultural consumption in Million Units<br />

(MUs)<br />

3788 4349 10144<br />

4 Industrial consumption<br />

in Million Units (MUs)<br />

7442 3030 10675<br />

5 High voltage consumption in Million Units<br />

(MUs)<br />

5831 2445 9251<br />

6 Per capita consumption <strong>of</strong> electricity 581 715 999<br />

7 No. <strong>of</strong> bore wells 11.14 lakhs 15.67 lakhs<br />

8 Irrigation by bore wells in lakhs acres 22.0 31.0<br />

9 Consumption in bore wells in Million Units<br />

(MUs)<br />

7100 10100<br />

10 Subsidy in Rs. Crores 865 894 2028<br />

11 No <strong>of</strong> Distribution Transformers<br />

240<br />

211489 208157 316522<br />

12 Number <strong>of</strong> 400 KV Sub-stations 3 2 4<br />

13 Number <strong>of</strong> 220 KV Sub-stations 33 21 42<br />

14 Number <strong>of</strong> 132 KV Sub-stations 88 53 136<br />

15 Number <strong>of</strong> 33 KV Sub-stations 1158 772 1784<br />

16 Number <strong>of</strong> Shunt Capacitors installed for<br />

improvement <strong>of</strong> voltage pr<strong>of</strong>iles (MVAR)<br />

0 90 300<br />

17 Proposed 400 KV Sub-stations in 2010-12 0 0 3<br />

18 Proposed 220 KV Sub-stations in 2010-12 0 4 13<br />

19 Generation Installed capacity as on 30-6-2010<br />

in MW<br />

20 Agency‟s generation addition program during<br />

2011-14<br />

Data in Sl. Nos. 1 to 16 above pertains to the year 2009-10<br />

5242 (46%) 1840 (16%) 4368 (38%)<br />

Kakateeya:600 MW<br />

KTPS: 500 MW<br />

Sattupalli: 600 MW<br />

Singareni:1200 MW<br />

Jurala: 200 MW<br />

Total : 3100 MW