Pre-Application Consultation Report<br />

to demonstrate who has been consulted;<br />

to set out what information was gained from consultees during PAC and how<br />

this was responded to; and<br />

to identify how the proposals have changed in light of PAC.<br />

1.4 ERC REPORTING GUIDANCE<br />

The layout and information provided in this report follows the guidance set out by<br />

ERC 5 on what the PAC Report should contain. This information is included in<br />

Table 1.1.<br />

Table 1.1 PAC Report Content<br />

PAC Report Content Location in PAC Report<br />

1. Description of the development Section 2.2<br />

2. Address of the site Section 2.3<br />

3. A plan of the site must be included Figure 2.1<br />

4. Contact details of the applicant Section 2.4<br />

5. Did the planning authority adopt a screening opinion? Section 2.5<br />

6. Did the Scottish Ministers make a screening direction? Section 2.5<br />

7. Enclose a copy of the Proposal of Application Notice<br />

stating the date it was published<br />

8. Date the application notice was given by applicant with<br />

copy of the notice enclosed<br />

Section 2.6 and Annex A<br />

Section 2.6 and Annex A<br />

9. The consultation that was undertaken Section 2.7 and Table<br />

2.1<br />

10. When the consultation was undertaken Table 2.1<br />

11. Details of the date and location of the public event Table 2.1 and Annex C<br />

12. The parties who were consulted Table 2.1 and Section<br />

3.2<br />

13. A summary of the views of the consultees Tables 3.1 and 3.2<br />

14. Specify what responses the prospective applicant has<br />

made to allay any concerns/objections which were raised<br />

15. Specify what alterations if any to the proposal have been<br />

made as a result of the consultations undertaken<br />

1.5 LAYOUT OF THE PAC REPORT<br />

The remainder of the report is structured as follows:<br />

Tables 3.1 and 3.2<br />

Section 4.2<br />

Section 2 provides information on the key information relating to the proposals<br />

and the consultation activities which were undertaken.<br />

5 East <strong>Renfrewshire</strong> <strong>Council</strong> (2009) Pre-application consultation for ‘National’ and ‘Major’ developments.<br />

Guidance Note for prospective applicants for planning permission<br />

Natural Capital Ltd 2 Falck Renewables

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!