Pre-Application Consultation Report<br />

Consultee Consultee Comments and Feedback Action / Response Taken Further Information<br />

No. Type Date<br />

Received<br />

Project Description<br />

traffic and access<br />

effects are assessed in<br />

Chapter 4: Traffic and<br />

Access<br />

commissioned to assess the<br />

current proposals<br />

4. The lifespan of this windfarm<br />

development would be likely to be<br />

some 25 years. Decommissioning<br />

of the windfarm site would take<br />

place once the site ceases<br />

operation. A financial sum or bond<br />

would be provided by windfarm<br />

developers for the<br />

decommissioning and restoration<br />

works.<br />

5. The details of the project team<br />

and the EIA methodology will be<br />

provided in the ES. As stated in<br />

leaflet the visualisations shown are<br />

indicative and the final position of<br />

turbines may change. The<br />

visualisations have been generated<br />

using a computer model to help<br />

understand what the development<br />

might look like. Further updated<br />

visualisations will be included in the<br />

ES<br />

The draft access track layout of the<br />

proposal as consulted on at the<br />

public exhibition in October 2009 is<br />

now available on the website<br />

6. A location for some<br />

infrastructure, such as the substation,<br />

has not yet been identified<br />

but once decided will be assessed<br />

in the EIA and reported in the ES.<br />

The timeframe for construction of<br />

the access roads, infrastructure<br />

and despoliation.<br />

4. The lifespan of windfarms is around<br />

twenty years, yet there appears to be no<br />

mention of plans to restore the<br />

landscape to its present natural wild<br />

state. How you will address this problem<br />

is a question to which an answer is<br />

urgently requested.<br />

5. I am particularly interested in the photo<br />

montages which were produced to<br />

support this proposal and which were<br />

published in your promotional literature.<br />

To obviate any suggest ion of them<br />

being misleading, will you please outline<br />

(a) The software used to produce them<br />

(b) The computer programming model<br />

used (c) The degree to which turbine<br />

positioning will change in the plans (d)<br />

The company contracted to undertake<br />

the photography and montage work and<br />

the costs involved.<br />

6. What is not shown, nor mentioned, is<br />

the location, scale and timeframe of the<br />

construction of access roads and<br />

infrastructure. Please address this<br />

issue.<br />

The above constitute some of my<br />

observations on this proposal and your reply<br />

will influence the degree to which I will place<br />

objections before the planning authorities<br />

Natural Capital Ltd 22 Falck Renewables