4. Describe the development that is to be carried out and state whether it will be a national or a major<br />

application:<br />

LOCATION - The project would be based on land owned by a consortium of five farmers in the<br />

<strong>Moorhouse</strong> area, to the west of Eaglesham and some eight kilometres (km) south west of Glasgow,<br />

between the M77 and the B764 (NGR NS 527 507) . The proposed site is set on the gentle hills<br />

between the M77 to the west, A726 to the north and B764 to the south east. On the western<br />

boundary of the site lies Eastwood Golf Course with Bonnyton Golf Course situated on the eastern<br />

boundary. The village of Eaglesham is situated approximately 2km to the east of the site with the<br />

southern edges of Newton Mearns lying to the north of the site.<br />

THE PROPOSED SITE - The study area itself includes various scattered residential properties<br />

(approximately five houses). There is a small area of woodland to the north east of the site, Long<br />

Wood. Various access tracks, which tend to connect properties to fields and reservoirs, exist<br />

throughout the site. The site is drained by a series of small burns which drain into Lochcraig<br />

Reservoir and Bennan Loch which are located centrally on the site and are used as public water<br />

supply reservoirs.<br />

THE PROPOSALS - The anticipated potential capacity of the windfarm is estimated to be 40 Mega<br />

Watts (MW) with between 16 and 20, two to three MW turbines with a maximum tip height of 125m.<br />

This is classed within the major application category as defined in the (draft) Town and Country<br />

Planning (Hierarchy of Developments) (Scotland) Regulations 2009. The turbines would be of a<br />

typical modern design incorporating tubular towers and three blades attached to a nacelle housing<br />

the generator, gearbox and other operating equipment. The transformer for each turbine would be<br />

housed either adjacent to the tower base or within the tower itself. This would depend on the chosen<br />

turbine manufacturer’s specification. The average wind speed on the site is high and it is therefore<br />

expected that Class 1 turbines would be required such as the Nordex 2.5MW N90.<br />

The key components of the proposals are: some 16-20 wind turbines; three anemometer masts; a<br />

permanent access route into the site from the B764; access tracks and underground cabling within<br />

the site; an electrical sub-station; a site office and store (may be the same building); and associated<br />

communications and other infrastructure.<br />

FURTHER DETAIL - For more detailed information on the proposals please refer to our Scoping<br />

Report which was submitted to East <strong>Renfrewshire</strong> <strong>Council</strong> Planning Department in October<br />

2008.<br />

5. Has the <strong>Council</strong> adopted a screening opinion; or have the Scottish made a screening direction (under<br />

the Environmental Impact Assessment (Scotland) Regulations 1999) regarding the need for an<br />

Environmental Impact Assessment in respect of the development?<br />

Screening opinion: No Yes , if ‘yes’ give date of opinion:<br />

Screening direction No Yes , if ‘yes’ give date of direction:<br />

If yes to either of the above, please provide full details: The project team submitted a Scoping Report<br />

to East <strong>Renfrewshire</strong> <strong>Council</strong> Planning Department in October 2008. A scoping direction from East<br />

<strong>Renfrewshire</strong> <strong>Council</strong> Planning Department on November 21st 2008 was received providing guidance<br />

on key subject areas that the EIA should address.<br />

N:\PROJECTS\185_<strong>Moorhouse</strong> <strong>Windfarm</strong>\Consultation\Statutory PAC Consultation\Pre-application Notice\Proposal of Application Notice for<br />

<strong>Moorhouse</strong> <strong>Farmers</strong> <strong>Windfarm</strong>_26.06.09.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!