28.02.2014 Views

The Development of Neural Network Based System Identification ...

The Development of Neural Network Based System Identification ...

The Development of Neural Network Based System Identification ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LIST OF FIGURES<br />

xxiii<br />

5.13 <strong>The</strong> prediction from HMLP network for pitch dynamics. (a) <strong>The</strong> one-step<br />

ahead prediction overlaid with the measured helicopter responses. (b)<br />

<strong>The</strong> error plot between one-step ahead prediction and the measurement<br />

data. <strong>The</strong> red dashed line indicates estimation from the HMLP neural<br />

network model while solid blue line with ‘x’ marker represents the output<br />

measurement. 136<br />

5.14 <strong>The</strong> self connection α strength selection results using modified Elman<br />

network with reduced connection.<br />

<strong>The</strong> Elman network training are<br />

repeated 10 times and validated on a test set. <strong>The</strong> training is carried out<br />

using 6 hidden neurons. 139<br />

5.15 <strong>The</strong> validation RMSE comparison for different hidden neuron sizes. <strong>The</strong><br />

k-cross validation process was conducted for modified Elman network<br />

with network structure <strong>of</strong> 4 regressors (n y = 1 and n u = 1). <strong>The</strong> neural<br />

network training was carried out using the <strong>of</strong>f-line Levenberg-Marquardt<br />

(LM) algorithm. 140<br />

5.16 <strong>The</strong> prediction from the modified Elman network for roll dynamics. (a)<br />

<strong>The</strong> one-step ahead prediction overlaid with the measured helicopter<br />

responses. (b) <strong>The</strong> error plot between one-step ahead prediction and the<br />

measurement data. <strong>The</strong> red dashed line indicates estimation from the<br />

modified Elman network while solid blue line with ‘x’ marker represents<br />

the output measurement. 141<br />

5.17 <strong>The</strong> prediction from the modified Elman network for pitch dynamics.<br />

(a) <strong>The</strong> one-step ahead prediction overlaid with the measured helicopter<br />

responses. (b) <strong>The</strong> error plot between one-step ahead prediction and the<br />

measurement data. <strong>The</strong> red dashed line indicates estimation from the<br />

modified Elman network while solid blue line with ‘x’ marker represents<br />

the output measurement. 142<br />

5.18 <strong>The</strong> percentage <strong>of</strong> Root Mean Square Error (RMSE) comparison plot for<br />

<strong>of</strong>f-line Levenberg-Marquardt (LM) and recursive Gauss-Newton (rGN)<br />

training methods. 145

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!