traffic. This practice should not be allowed. Buses should stop 30 meters ahead where a<br />

third lane is available<br />

So at this place only two lanes are available on the corridor. This is practically the same<br />

traffic that uses the 5 lanes theoretically available from this point to Cempaka Mas.<br />

As calculated be<strong>for</strong>e, the traffic volume, by considering future increase, will require a<br />

width of 11.0 meters. Field analysis indicates that the present volume passes normally in<br />

3 lanes and sometimes just in two lanes.<br />

In our meetings with the busway team, the team’s justification presented <strong>for</strong> 5 lanes is<br />

based on an ef<strong>for</strong>t to preserve the local lanes <strong>for</strong> local traffic, that in practice means<br />

preserving the local lanes <strong>for</strong> parking and stopping vehicles. This means Jakarta would<br />

be cutting trees to preserve existing parking practices on the corridor.<br />

VI.4.d. Segment Galur Flyover to Senen<br />

For this segment the busway project will have two bus stops:<br />

Galur: located 100 meters after (to the west) Galur flyover. The existing plan proposed<br />

by the busway team seems appropriate.<br />

Senen: Located between Senen flyover intersection and the approach of the Senen tunnel<br />

which is under construction. <strong>ITDP</strong> has not seen the design of this bus stop, so there is no<br />

comment on it.<br />

VI. 5. Specific Recommendations <strong>for</strong> Intersections in Corridor II<br />

VI.5.a. Senen intersection<br />

Presently there is a four-phase signalized intersection.<br />

Future design of this intersection depends on the <strong>BRT</strong> itinerary from Senen to the West<br />

which is not yet decided by the government.<br />

Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 107