traffic. This practice should not be allowed. Buses should stop 30 meters ahead where a<br />
third lane is available<br />
So at this place only two lanes are available on the corridor. This is practically the same<br />
traffic that uses the 5 lanes theoretically available from this point to Cempaka Mas.<br />
As calculated be<strong>for</strong>e, the traffic volume, by considering future increase, will require a<br />
width of 11.0 meters. Field analysis indicates that the present volume passes normally in<br />
3 lanes and sometimes just in two lanes.<br />
In our meetings with the busway team, the team’s justification presented <strong>for</strong> 5 lanes is<br />
based on an ef<strong>for</strong>t to preserve the local lanes <strong>for</strong> local traffic, that in practice means<br />
preserving the local lanes <strong>for</strong> parking and stopping vehicles. This means Jakarta would<br />
be cutting trees to preserve existing parking practices on the corridor.<br />
VI.4.d. Segment Galur Flyover to Senen<br />
For this segment the busway project will have two bus stops:<br />
Galur: located 100 meters after (to the west) Galur flyover. The existing plan proposed<br />
by the busway team seems appropriate.<br />
Senen: Located between Senen flyover intersection and the approach of the Senen tunnel<br />
which is under construction. <strong>ITDP</strong> has not seen the design of this bus stop, so there is no<br />
comment on it.<br />
VI. 5. Specific Recommendations <strong>for</strong> Intersections in Corridor II<br />
VI.5.a. Senen intersection<br />
Presently there is a four-phase signalized intersection.<br />
Future design of this intersection depends on the <strong>BRT</strong> itinerary from Senen to the West<br />
which is not yet decided by the government.<br />