principal contract. The software to run the ticketing system had been designed by a<br />

different sub-contractor to Angelcom SA, a local subsidiary of a French IT company.<br />

Medina Inox hired a <strong>for</strong>mer staff member from Angelcom SA who brought with him<br />

some of the technical knowledge necessary to run the system, but not enough to adapt the<br />

system to Jakarta’s different ticketing system needs. Medina Inox is now being sued by<br />

Angelcom on the basis of theft of intellectual property rights.<br />

DisHub procured the contactless ‘smart cards’ from MIFARE, another local partner of<br />

Medina-Inox, again without a competitive bid.<br />

Upon the creation of BP <strong>TransJakarta</strong>, BP <strong>TransJakarta</strong> then contracted out <strong>for</strong> one year<br />

the operation of the ticketing system to a separate company, PT Lestari Abadi after a<br />

competitive bid between four pre-determined candidates, which were evaluated with<br />

<strong>TransJakarta</strong>’s own evaluation criteria. A full open tender was not held since time was<br />

very limited. PT Lestari Abadi operates as ticket sales and revenue collector operator<br />

only.<br />

DisHub was supposed to transfer the ticketing system equipment to <strong>TransJakarta</strong>, but<br />

because it never worked well, <strong>TransJakarta</strong> refused to take ownership of it.<br />

Since the opening of <strong>TransJakarta</strong>’s Bus Rapid Transit system in January of 2004, the<br />

ticketing system has not worked well. The following problems were the most serious:<br />

o Customers initially faced long delays waiting to purchase tickets and entering the<br />

gate barrier.<br />

o The turnstiles were frequently unable to read the smart cards due to electrical and<br />

mechanical failures.<br />

o The smart cards procured were sub-standard and many of them failed.<br />

o The amount of revenue collected was difficult <strong>for</strong> <strong>TransJakarta</strong> to track because<br />

the data was consolidated by DisHub, and this data was incomplete, and not sent<br />

in a secure <strong>for</strong>m to <strong>TransJakarta</strong>.<br />

o The system was not programmed in a way to handle early morning discounts or<br />

discounts from passengers transferring from feeder buses.<br />

o The system was not installed with proper grounding and power stabilization<br />

equipment.<br />

While many of the problems were technical, they were at root contractual and<br />

institutional problems. Some of the problems encountered could have been avoided had<br />

DisHub signed a better contract with the equipment manufacturer. The contract should<br />

have required the equipment provider to provide ongoing service, and part of the payment<br />

should have been withheld until after the system was operational. The contract should<br />

have included stiff penalties <strong>for</strong> failure. Nor did the contract guarantee the transfer of the<br />

secret keys necessary to allow a second party to reprogram the system. As a result, when<br />

problems arose, the ticketing equipment supplier tried to get additional resources out of<br />

DisHub be<strong>for</strong>e agreeing to fix the problem. We do not know the degree to which the<br />

Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 43