Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Making TransJakarta a World Class BRT System - ITDP | Institute for ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
the lack of physical separation of the Busway Corridor and the intersection design at Jl.<br />
Trunojoyo/Sisingamanga Raja, causing a significant delay in service.<br />
The best solution <strong>for</strong> removing this bottleneck is to turn Jl. Trunojoyo from the current<br />
two way street to a one-way, East-bound street, and to turn Hang Tuah 7 from the current<br />
two way street into a one-way West-bound<br />
street.<br />
This would then allow <strong>for</strong> the conversion of<br />
the traffic signal at Jl.Trunojoyo/<br />
Sisingamangaraja from four phases to two<br />
phases.<br />
This transition in turn will require the<br />
opening and signalization of the intersection<br />
at Patimura and Senjaya.<br />
Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 80