09.03.2014 Views

Making TransJakarta a World Class BRT System - ITDP | Institute for ...

Making TransJakarta a World Class BRT System - ITDP | Institute for ...

Making TransJakarta a World Class BRT System - ITDP | Institute for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.5<br />

3<br />

2.5<br />

2<br />

1.5<br />

1<br />

0.5<br />

0<br />

0 5 10 15 20 25 30<br />

Planning <strong>for</strong> Corridor II was also more advanced than on corridor 3, so our evaluation is<br />

more detailed <strong>for</strong> Corridor II.<br />

VI.4.a. Segment Pulo Gadung – Flamboyan (1.2 km)<br />

VI.4.a.i. Typical Existing Cross Section:<br />

Corridor 2 typical section: Pulugadung – Flamboyan (Mediros Hospital)<br />

Type sidewalk<br />

(north)<br />

traffic<br />

w>e<br />

Island<br />

traffic<br />

e>w<br />

sidewalk<br />

(south)<br />

Width 2.9 9.45 0.85 9.42 2.9<br />

Sum 2.9 12.35 13.2 22.62 25.52<br />

This first stretch has a narrow section, with only three lanes per direction. Width of<br />

sidewalk is less than three meters available. On practical terms, the first curb lane is<br />

rarely used <strong>for</strong> a real flow traffic lane, but it is being used <strong>for</strong> parking, pedestrian, street<br />

vendors, etc.<br />

Photo 1:<br />

Pulogadung – Flamboyan<br />

(Mediros Hospital)<br />

Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!