V. INCREASING THE BUSWAY’S CAPACITY AND<br />

SPEED IN CORRIDOR I<br />

V.1. Bus and Station Design<br />

When Corridors II and III open, demand on Corridor I will rise to some 3644 pphpd.<br />

Un<strong>for</strong>tunately, right now <strong>TransJakarta</strong> Corridor I can only accommodate some 2700<br />

pphpd, and conditions are already overcrowded at peak hour in some locations:<br />

There are three main causes and several minor causes of very low capacity on<br />

<strong>TransJakarta</strong>:<br />

? Buses and bus stops have only one door, reducing boarding and alighting speed<br />

? The size of the bus is small <strong>for</strong> a high volume <strong>BRT</strong> corridor.<br />

? The security person stands in the doorway during boarding and alighting,<br />

impeding the speed of boarding and alighting<br />

A rough estimate of the effects of these three easily fixable problems is as follows:<br />

Average<br />

boarding time<br />

(seconds)<br />

Bus stop<br />

Capacity time Speed Fleet<br />

(pass/h) (seconds)(km/h)<br />

(buses)<br />

Present<br />

Situation 2.5 2700 45 17 60<br />

Improving<br />

boarding 1.7 3700 35 19 56<br />

Bus with two<br />

doors 0.5 6000 22 21 51<br />

With<br />

articulated<br />

bus 0.3 9600 18 23 26<br />

Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 76