Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3.5<br />
2.5<br />
1.5<br />
0.5<br />
3<br />
2<br />
1<br />
0<br />
3.5<br />
3<br />
2.5<br />
2<br />
1.5<br />
1<br />
0.5<br />
0<br />
0 5 1 0 15 20 2 5 30 35<br />
0 5 10 1 5 20 25 3 0 35<br />
<strong>BRT</strong><br />
Phase 1 Phase 2 Phase 3<br />
The <strong>BRT</strong> buses would stop to allow right conversion (similar to corridor 1 conversion<br />
from south to east - Jl. Majapahit to Jl. Juanda)<br />
After the <strong>BRT</strong> is implemented, assuming that the pavement on the railroad crossing is<br />
improved and maintained, the general traffic would run at higher velocities than it does<br />
today.<br />
Of course if the remaining buses continue to stop in the mixed traffic lanes, as is the<br />
current habit of the bus drivers which stop and wait to fill passengers, this will cause<br />
congestion if not controlled (police control).<br />
Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 121