Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
VI.6.a.ii. Bottlenecks (actual and future)<br />
In all figures north is up, like normal geographical maps. We comment on present<br />
operation and suggest improvements needed to maintain or reduce v/c (volume/capacity)<br />
ratio and increase general flow quality after the <strong>BRT</strong> is implemented.<br />
The first stretch (east side) with 700 meters is with low commercial use, no traffic signals<br />
and operates at low v/c ratio, and high velocity.The second stretch from Jl. A.M Sangaji<br />
to Jl. K.H Mas Mansyur has three signalized intersection, as follows:<br />
Jl. A.M Sangaji<br />
Cycle = 96 second<br />
Consists of 1 phase, right turns not allowed on corridor, north approach is one way, and<br />
south approach is two ways, as follow:<br />
Phase 1 Phase 2 Phase 3<br />
Volumes on transversal are quite low and the 3-phase scheme is operating well.<br />
Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 114