IV.1. Projected Demand on Current Corridor II and III<br />

Because of flaws with the SITRAMP model developed by JICA (gaps in the network,<br />

lack of data on paratransit vehicles or occupancy, and exaggerated expansion factors),<br />

<strong>ITDP</strong> in cooperation with the University of Indonesia Center <strong>for</strong> Transportation Studies<br />

created a new traffic model in EMME/2 <strong>for</strong> the <strong>TransJakarta</strong> system to assist with the<br />

design of future corridors and contract negotiations with potential operators. Over 60,000<br />

on-board origin destination surveys were conducted with transit passengers. Calibration<br />

of the entire network was also done with observed data. The control points <strong>for</strong> observed<br />

volumes of passengers correspond to the 60 bi-directional sections of the OD survey,<br />

which were used to expand the OD. In addition, 12 bidirectional points were added to<br />

refine the adjustment.<br />

<strong>TransJakarta</strong> currently counts between 60,000 and 65,000 daily passengers. When<br />

modeled using the <strong>ITDP</strong>/UI CTS traffic model, we get the following simulation results:<br />

MORNING PEAK<br />

ACTUAL<br />

Lines Headway extension Travel time Boarding pax Max Volume<br />

BM-KT 1.5 13.01 43.58 2583 2281<br />

KT-BM 1.5 13.02 43.61 1754 1588<br />

TOTAL 26.03 4337<br />

DAILY PASSENGERS<br />

Lines Boarding pax<br />

BM-KT 37144<br />

KT-BM 25223<br />

TOTAL 62366<br />

Based on the request of <strong>TransJakarta</strong>, <strong>ITDP</strong> evaluated the projected demand on Corridor<br />

II (Pulogadung-Harmoni) and Corridor III (Kalideres-Harmoni) based on the currently<br />

planned itinerary, as below:<br />

Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 57