Railroad crossing<br />

As mentioned be<strong>for</strong>e, road maintenance even only at the rail crossing is very essential.<br />

We also recommend: interrupt bus lane in both directions, about 20.0<br />

meters be<strong>for</strong>e the crossing and start again 30.0 meters after.<br />

Rail road (Grogol): Kyai Tapa<br />

This stretch is strictly express and problems can be found only on the extremities (Grogol<br />

intersection and the U- turn west>west near railroad crossing) that will be discussed<br />

separately.<br />

The Length is 1.5 km with local and express lanes on each direction, two pedestrian<br />

bridges that correspond to the two proposed busway bus stops. Middle island is wide with<br />

a lot of trees. Side walks are also very wide especially on the north side, where there is<br />

also a secondary local street parallel to the corridor:<br />

Corridor 3 (Harmony – Railroad): Proposed typical section<br />

trafic<br />

w>e<br />

local<br />

Sep Traffic<br />

w>e<br />

express<br />

Island<br />

traffic<br />

e>w<br />

express<br />

Sep Traffic<br />

e>w<br />

local<br />

Sidewalk<br />

(south)<br />

Type Sidewalk<br />

(north)<br />

width 19 8 0.4 8 6 8 0.4 8 6<br />

sum 19 27 27 35.4 41.4 49.4 49.8 57.8 63.8<br />

From the table it can be seen that the corridor on this segment is very wide, and there is<br />

enough space <strong>for</strong> everything. The only important project option <strong>for</strong> now is if we can<br />

implement the busway by only using the present road space or shall we widen it.<br />

Directional peak hour future volume is estimated around 5200 pcu, and if adopting the<br />

same value of 420 pcu/m <strong>for</strong> a very adequate V/C ratio, about 5200/420 = 12.3 meters <strong>for</strong><br />

the general traffic will be needed.<br />

Each direction has 8+8+0.4 = 16.4 m (including separator, and if we subtract<br />

3.3 <strong>for</strong> the bus lane then the remaining space will be 13.1 m or only a little<br />

more than the 12.3 needed.<br />

There<strong>for</strong>e, our recommendation is just remove the separator and let the 13.1 meters only<br />

<strong>for</strong> a 4 lanes road per direction (3.27 meters each lane) and that is the same present<br />

number of lanes, as described below:<br />

Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 122