Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Making TransJakarta a World Class BRT System - ITDP | Institute for ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3.5<br />
3<br />
2.5<br />
2<br />
1.5<br />
1<br />
0.5<br />
0<br />
Railroad crossing<br />
As mentioned be<strong>for</strong>e, road maintenance even only at the rail crossing is very essential.<br />
We also recommend: interrupt bus lane in both directions, about 20.0<br />
meters be<strong>for</strong>e the crossing and start again 30.0 meters after.<br />
Rail road (Grogol): Kyai Tapa<br />
This stretch is strictly express and problems can be found only on the extremities (Grogol<br />
intersection and the U- turn west>west near railroad crossing) that will be discussed<br />
separately.<br />
The Length is 1.5 km with local and express lanes on each direction, two pedestrian<br />
bridges that correspond to the two proposed busway bus stops. Middle island is wide with<br />
a lot of trees. Side walks are also very wide especially on the north side, where there is<br />
also a secondary local street parallel to the corridor:<br />
Corridor 3 (Harmony – Railroad): Proposed typical section<br />
trafic<br />
w>e<br />
local<br />
Sep Traffic<br />
w>e<br />
express<br />
Island<br />
traffic<br />
e>w<br />
express<br />
Sep Traffic<br />
e>w<br />
local<br />
Sidewalk<br />
(south)<br />
Type Sidewalk<br />
(north)<br />
width 19 8 0.4 8 6 8 0.4 8 6<br />
sum 19 27 27 35.4 41.4 49.4 49.8 57.8 63.8<br />
From the table it can be seen that the corridor on this segment is very wide, and there is<br />
enough space <strong>for</strong> everything. The only important project option <strong>for</strong> now is if we can<br />
implement the busway by only using the present road space or shall we widen it.<br />
Directional peak hour future volume is estimated around 5200 pcu, and if adopting the<br />
same value of 420 pcu/m <strong>for</strong> a very adequate V/C ratio, about 5200/420 = 12.3 meters <strong>for</strong><br />
the general traffic will be needed.<br />
Each direction has 8+8+0.4 = 16.4 m (including separator, and if we subtract<br />
3.3 <strong>for</strong> the bus lane then the remaining space will be 13.1 m or only a little<br />
more than the 12.3 needed.<br />
There<strong>for</strong>e, our recommendation is just remove the separator and let the 13.1 meters only<br />
<strong>for</strong> a 4 lanes road per direction (3.27 meters each lane) and that is the same present<br />
number of lanes, as described below:<br />
Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 122