09.03.2014 Views

Making TransJakarta a World Class BRT System - ITDP | Institute for ...

Making TransJakarta a World Class BRT System - ITDP | Institute for ...

Making TransJakarta a World Class BRT System - ITDP | Institute for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Under the flyover, we<br />

propose creating a new<br />

local route just <strong>for</strong><br />

traffic interconnecting<br />

with Genderal Gatot<br />

Subroto. These local<br />

roads (one on each<br />

direction) shall be<br />

constructed under lateral<br />

clearance available on<br />

the bridge. This solution<br />

will improve capacity<br />

under the bridge from 3<br />

to 8 lanes, 4 just <strong>for</strong><br />

straight flow, and 4 <strong>for</strong><br />

turns (2 <strong>for</strong> direct<br />

movements ahead and<br />

left and 2 <strong>for</strong> right<br />

turns).<br />

This configuration<br />

would allow the use of a<br />

merge way between<br />

local and express ways<br />

in order to not overload<br />

the expressway.<br />

V.3.d.The Veteran/Hayam Wuruk/Harmony/Pranoto Intersection and the and<br />

Hayam Wuruk/Hasyim Ashari Intersection<br />

These two intersections are already major bottlenecks and will become even more serious<br />

bottlenecks when Corridor II and III are completed. <strong>ITDP</strong> developed a concept <strong>for</strong><br />

improving its function with a single North-South <strong>TransJakarta</strong> line. However, with the<br />

addition of Corridor II and Corridor III, we were unable to develop a design until we<br />

knew the routing <strong>for</strong> Corridor II and III, and the bus routes on it. Dishub engineers<br />

should consult leading traffic experts like Pedro Szasz or others from reputable firms <strong>for</strong><br />

reconfiguring these intersections be<strong>for</strong>e Corridor II and III are opened to avoid a major<br />

bottleneck.<br />

Final Recommendations <strong>for</strong> <strong>TransJakarta</strong>, p. 82

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!