81<br />

Activities: Milestones: Budget: Risks & Assumptions<br />

1. Set-up visit to Ghana by 1. Set-up visit in M1;<br />

a) UK staff costs £24,225<br />

research leader<br />

2. Initial methodology workshop M1;<br />

b) Overseas staff costs £19,850<br />

2. Initial methodology<br />

development workshop<br />

3. Ghana field team selected by end M2; briefed <strong>and</strong><br />

trained by end M3;<br />

c) Overheads £20,600<br />

d) Capital Equipment £1,500<br />

held (UK);<br />

4. Institutional review by end M4;<br />

e) O/seas Travel £17,000<br />

3. Literature Review<br />

5. Literature review by end M3;<br />

f) Miscellaneous £6,400<br />

prepared;<br />

6. Inventory <strong>of</strong> interested stakeholders by end M4;<br />

4. Research team formed <strong>and</strong> 7. Pilot study sites selected by end M4;<br />

Totals:<br />

trained;<br />

8. Case study research in period M4-M9;<br />

FY 2001-2: £19,610<br />

5. Inventory <strong>of</strong> stakeholders; 9. Economic incentives scoping study by end M6; FY 2002-3: £69,965<br />

6. Institutional review <strong>of</strong><br />

forest management at the<br />

FAI in Ghana;<br />

10. Supplementary field visits undertaken by end M9;<br />

11. Stakeholder workshops, M10;<br />

12. End <strong>of</strong> project workshop, M11;<br />

7. Pilot sites selected; 13. <strong>Public</strong>ations, M12 & subsequently;<br />

8. Field research undertaken; 14. Report to NRSP, M12; revisions M13;<br />

9. Economic scoping study<br />

undertaken,<strong>and</strong> findings<br />

fed into overall research<br />

study;<br />

15. UK presentation <strong>of</strong> findings M13;<br />

10. Supplementary field visits;<br />

11. Stakeholder review<br />

meetings;<br />

12. End <strong>of</strong> project workshop<br />

(Ghana);<br />

13. Report <strong>and</strong> review paper<br />

drafted/ redrafted;<br />

14. NRSP Report prepared;<br />

15. ODI seminar to present<br />

findings.<br />

Pre-condition:<br />

1. Lack <strong>of</strong> cooperation at field<br />

level from local authorities, etc.<br />

2. Policy makers <strong>and</strong> other<br />

decision makers have time<br />

available to meet researchers <strong>and</strong><br />

participate in workshops, <strong>and</strong> are<br />

not suffering from workshop<br />

overload.<br />

Capable personnel are identified<br />

for the research assistant posts<br />

81