HQ Pro-Stitcher User Manual - Handi Quilter
HQ Pro-Stitcher User Manual - Handi Quilter
HQ Pro-Stitcher User Manual - Handi Quilter
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Setting up the New Carriage<br />
1. With the <strong>HQ</strong> <strong>Pro</strong>-<strong>Stitcher</strong> carriage set properly<br />
on the frame system, untie the black twist ties that<br />
are binding the black cables in a loop. Drape the<br />
black cables over the back of the carriage as shown in<br />
Figure 11.<br />
2. Plug one branch of the new “Y” power cord<br />
(Page 3, I) into the power supply located toward the<br />
rear of the carriage (Figure 12). Route the power<br />
cord as shown in Figure 11. It is also permissible to<br />
have the power cord extend directly out the side of<br />
the carriage rather than over the top of the carriage.<br />
3. With the X-axis engagement lever shifted into the<br />
lowest position, verify that the white gear at the front<br />
of the carriage fully engages with the blue rack that<br />
was previously installed.<br />
Plug<br />
Figure 12<br />
a. If the white gear fails to lower enough with the<br />
front disengagement lever in its lowest position, you<br />
will need to adjust the black X-axis lever bracket to<br />
allow the X-axis engagement lever to drop a little<br />
lower. To do this, loosen the two 4mm Allen bolts<br />
and pivot the bracket downward until the white gear<br />
is pressing firmly on the blue rack, then re-tighten<br />
the two bolts (Figure 13).<br />
b. Move the carriage along the length of the table to<br />
double-check the placement of the blue rack. Make<br />
adjustments to the blue rack as necessary.<br />
Adjust only<br />
if necessary<br />
Figure 13<br />
Page 8<br />
Figure 11<br />
<strong>HQ</strong> <strong>Pro</strong>-<strong>Stitcher</strong> <strong>User</strong> <strong>Manual</strong>