Parameters for Procurement Specifications<br />

1<br />

Turbomach earned the contract for the engineering, procurement and<br />

construction (EPC) of the biomass-fired power plant in Lucena, Córdoba. The<br />

plant is based on a 14.3 MWe gas turbine generator package, an olive oil<br />

residue incinerator and heat recovery system, and a 14.8 MWe steam turbine<br />

generator package. Turbomach has been acting as the main contractor and<br />

O&M contractor for the plant. The gas turbine and steam turbine generator<br />

packages are products from Turbomach.<br />

Operation and Maintenance<br />

1<br />

As discussed, the heat requirement for the drying process, on the basis of<br />

operating more than 8200 hours/year, permitted the installation of a 14.3<br />

MWe gas turbine generator package based on the Solar Titan 130 industrial<br />

gas turbine which generates more than 100,000 MWhth/year. The exhaust<br />

gases are supplied directly and in parallel to two tram-mel-type dryers. Gases<br />

exit the gas turbine generator at 45 kg/s at about 495°C. About 10% of the<br />

exhaust gases from the gas turbine is conducted to the biomass boiler to<br />

increase the plant efficiency by pre-heating the boiler’s combustion air, which<br />

will be regulated to minimize the formation of NOx and CO.<br />

The fuel efficiency of the cogeneration plant is close to 90%, whereas the<br />

electrical efficiency is 34%. Approximately 1.5 MWe is used for the plant’s<br />

own consumption. The gas turbine is fed with LNG stored at the site. In the<br />

future the plant will connect to the gas pipeline at the town of Lucena in<br />

Córdoba.<br />

Out of the approximately 92,600 tonnes/year of orujillo with 10% - 12%<br />

moisture and around 4000 kcal/kg of heating value, around 77,000 tonnes are<br />

burnt per year in the biomass plant. The rest will be provided as fuel to the<br />

Hermanos Santamaría plant.<br />

Orujillo is combusted in the biomass boiler that produces steam at<br />

highpressure and temperature. The biomass boiler will produce superheated<br />

steam at about 65 bars and 450°C, at about 55 tonnes/hour. The boiler has a<br />

high heat output so that the efficiency of the biomass plant surpasses 30%.<br />

The flue gas from the boiler is filtered to prevent the emission of particles <strong>into</strong><br />

the atmosphere.<br />

The steam produced is expanded up to 0.08 bar in a Turbomach-TV2 steam<br />

turbine generator package. The steam turbine is a MARC4C01 system<br />

manufactured by B+V Industrietechnik. It is equipped with an intermediate<br />

bleed to feed the thermal de-aerator. The steam turbine generator package<br />

has a capacity of about 14.8 MWe, with the export of some 104,000<br />

MWh/year of electrical energy.<br />

The electrical power generated by the plant at 11 kV will be connected to the<br />

Sevillana-Endesa grid at 66 kV via a step-up transformer station. The plant is<br />

furthermore provided with its own utilities for compressed air and low-voltage<br />

power (400 V). Both the gas turbine generator package and the steam turbine<br />

generator package are installed outdoor with their own individual<br />

133