New Construction C<strong>ategory</strong> (Merit)<br />

Nokia Beijing BDA Campus<br />

諾 基 亞 北 京 經 濟 技 術 開 發 區 中 國 園<br />

Location<br />

Completion Date 2008<br />

Beijing, China<br />

Green Building Rating Leadership in Energy <strong>and</strong> Environmental Design (LEED TM )<br />

Gold assessment tool is employed to evaluate the overall<br />

green building performance including building design,<br />

internal decoration <strong>and</strong> construction methodology<br />

Client/ Developer<br />

Project Manager<br />

Architect<br />

Civil & Structural Engineer<br />

Building Services Engineer<br />

L<strong>and</strong>scape Architect<br />

Sustainable Design Specialist<br />

Leed TM Specialist<br />

Main Contractor<br />

Nokia (CHINA) Investment Co., Ltd.<br />

M Moser Associates<br />

Arup (Beijing)<br />

Arup (Beijing)<br />

Arup (Beijing)<br />

Kenneth Ng & Associates Ltd.<br />

Arup (Hong Kong) (Applicant)<br />

Arup (Shanghai)<br />

Beijing Construction Engineering Group<br />

<strong>The</strong> Beijing Nokia China Campus, located in the BDA, serves as Nokia<br />

China’s headquarters <strong>and</strong> also as an R&D base. It is a six-storey building<br />

with two basement levels <strong>and</strong> contains office <strong>and</strong> R&D facilities, energy<br />

centre, bicycle shed, guard house, link-bridge to existing administration<br />

building <strong>and</strong> a covered walkway. <strong>The</strong> Office <strong>and</strong> R&D Building has<br />

a total gross floor area (GFA) of 71,417 sq m for accommodating<br />

2,300 employees. Master planning <strong>and</strong> design works commenced in<br />

September 2005, construction started in September 2006 <strong>and</strong> the<br />

project was completed in March 2008.<br />

For indoor environment, the Campus<br />

achieved higher IEQ St<strong>and</strong>ard with 30<br />

per cent more Fresh Air Supply Rate.<br />

In addition, more than 77 per cent of<br />

internal spaces are benefited by natural<br />

lighting. Moreover, measurement <strong>and</strong><br />

verification plan has been developed<br />

with the Client to verify the staff’s<br />

satisfaction to the new environment<br />

for every three months. For outdoor<br />

environment, the development achieves<br />

43% of greening ratio, while gravel<br />

<strong>and</strong> grasscrete as roofing materials are<br />

adopted to reduce heat isl<strong>and</strong> effect.<br />

In terms of energy <strong>and</strong> water, the<br />

remarkable construction of the campus<br />

includes features such as a doublelayer<br />

glass curtain wall, numerous water<br />

conservation mechanisms such as grey<br />

water recycling system, sophisticated<br />

methods to reduce light pollution,<br />

improved air ventilation, <strong>and</strong> more than<br />

30 design techniques which have all in<br />

all resulted in a building that reduces<br />

water use by up to 37 per cent <strong>and</strong> energy<br />

consumption by 21 per cent.<br />

新<br />

建<br />

建<br />

築<br />

類<br />

別<br />

優<br />

異<br />

32 33