GROUP / <strong>2013</strong> ALBUM 07<br />

includes Eurovia and VINCI Energies,<br />

together with other companies operating in<br />

the rail sector.<br />

The 302 km of new line and 38 km of connection<br />

lines to the stations employed<br />

8,000 people in <strong>2013</strong>, including more than<br />

2,000 local hires. The works focused primarily<br />

on the infrastructure: by the end of<br />

the year, more than 80% of the earthworks<br />

had been completed as had 321 civil<br />

engineering structures, with a further 159<br />

still under construction. In 2014, work on<br />

the superstructure – tracks and catenaries<br />

– will start, followed by power supply, signalling<br />

and telecommunications. The line is<br />

scheduled to come into service in 2017.<br />

The environmental component of the<br />

project is equally vast. Conducted in close<br />

collaboration with local authorities and<br />

nature conservation non-profit organisations,<br />

it consists of implementing offsetting<br />

measures over an area of more than<br />

3,000 hectares to protect the 223 endangered<br />

species that have been identified.<br />

In addition, 1,350 hectares will be replanted:<br />

1 million trees and shrubs of local origin<br />

will be planted inside the land take of the<br />

infrastructure and 2.7 million outside the<br />

land take.