24.12.2014 Views

2013-vinci-annual-report

2013-vinci-annual-report

2013-vinci-annual-report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GROUP / <strong>2013</strong> ALBUM 13<br />

components, enabling all parties involved<br />

in the project to share the same document<br />

database and then launch the industrial<br />

manufacture of the parts for the primary<br />

structure, frame, glass walls, the “icebergs”<br />

and their facing.<br />

Each part of the structure required an<br />

experimental technical authorisation<br />

(ATex), representing the same number of<br />

technological challenges in terms of<br />

materials and shapes. The steel primary<br />

frame alone, made up entirely of curved<br />

components to marry the building’s contours,<br />

required four years of design and<br />

study. The 19,000 facing panels for the icebergs<br />

were made from ultra-high performance<br />

fibre concrete. A totally new way of<br />

carrying out hot glass furnace-work was<br />

used to produce the 4,000 precisely curved<br />

and differentiated components of the<br />

12 glass walls. A special method, known as<br />

the “Last Planner System”, also had to be<br />

fine-tuned and rolled out to manage the<br />

construction’s exceptional complexity and<br />

coordinate the work of the various companies<br />

participating in the project. The Louis<br />

Vuitton Foundation will be opened to the<br />

public in 2014.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!