2013-vinci-annual-report
2013-vinci-annual-report
2013-vinci-annual-report
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
26. Concession and PPP contracts of companies accounted<br />
for under the equity method<br />
26.1 Main features of concession and PPP contracts<br />
The features of the main or new concession or public-private partnership contracts operated by companies accounted for under the equity<br />
method are shown below:<br />
Control and regulation<br />
of prices by<br />
concession grantor<br />
Remuneration paid<br />
by<br />
Motorway and road infrastructure (including bridges and tunnels)<br />
Grant or guarantee<br />
from concession<br />
grantor<br />
Residual value<br />
Concession end<br />
date<br />
Accounting model<br />
A5 Malsch-Offenburg<br />
A-Modell<br />
(60 km to be renovated,<br />
including 41.5 km to be<br />
widened to 2x3 lanes)<br />
(Germany)<br />
Inflation-linked price<br />
increases based on the<br />
2009 toll level (excluding<br />
increases decided by<br />
grantor). Impact of<br />
environmental<br />
regulations on tariffs<br />
(with traffic level risk)<br />
Heavy vehicle users<br />
through the tolls<br />
levied by grantor<br />
Nil<br />
Infrastructure returned<br />
to grantor at end of<br />
concession for no<br />
consideration<br />
2039 Intangible asset<br />
Hounslow<br />
Rehabilitation and<br />
maintenance of roadways,<br />
traffic signs and lighting<br />
(UK)<br />
Fee paid by grantor<br />
(with no traffic level<br />
risk)<br />
Grantor<br />
Nil<br />
Infrastructure returned<br />
to grantor at end of<br />
concession for no<br />
consideration<br />
2037 Financial asset<br />
Isle of Wight<br />
Rehabilitation and<br />
maintenance of roadways,<br />
traffic signs and lighting<br />
(UK)<br />
Annual fee paid by<br />
grantor (with no traffic<br />
level risk)<br />
Grantor<br />
Investment grant<br />
Infrastructure returned<br />
to grantor at end of<br />
concession for no<br />
consideration<br />
2038 Financial asset<br />
Granvia (R1 expressway)<br />
(Slovakia)<br />
Annual fee paid by<br />
grantor (with no traffic<br />
level risk)<br />
Grantor<br />
Nil<br />
Infrastructure returned<br />
to grantor at end of<br />
concession for no<br />
consideration<br />
2041 Financial asset<br />
Ohio River Bridges East<br />
End Crossing<br />
Bridge over the Ohio River<br />
and access tunnel<br />
(USA)<br />
Annual fee paid by<br />
grantor (with no traffic<br />
level risk)<br />
Grantor<br />
Investment grant<br />
Infrastructure returned<br />
to grantor for no<br />
consideration at the end<br />
of the contract.<br />
2051 Financial asset<br />
Olympia Odos<br />
Toll motorway connecting<br />
Elefsina, Corinth, Patras<br />
and Tsakona<br />
(Greece)<br />
Pricing law as defined in<br />
the concession contract.<br />
Price increases possible<br />
subject to a price limit<br />
(with traffic level risk)<br />
Users<br />
Investment grant<br />
Infrastructure returned<br />
to grantor for no<br />
consideration at the end<br />
of the contract.<br />
2038<br />
Bifurcated model:<br />
intangible asset and<br />
financial asset<br />
Railway infrastructure<br />
South Europe Atlantic<br />
high-speed rail line<br />
High-speed rail link<br />
between Tours and<br />
Bordeaux (303 km)<br />
(France)<br />
Stadium<br />
Stade Bordeaux<br />
Atlantique<br />
(France)<br />
Société Dunkerque<br />
Aréna<br />
(France)<br />
Other<br />
BAMEO<br />
Dams on the River Meuse<br />
in France<br />
Inflation-linked price<br />
increases (with traffic<br />
level risk)<br />
Rent paid by grantor<br />
and ancillary<br />
commercial revenue<br />
Rent paid by grantor<br />
and ancillary<br />
commercial revenue<br />
Rent paid by grantor<br />
(with no traffic level<br />
risk)<br />
Pricing law defined in<br />
the concession<br />
contract (on the basis<br />
of train kilometre and<br />
slot kilometre)<br />
Grantor, private<br />
partners<br />
Grantor, private<br />
partners<br />
Grantor<br />
Investment grant paid<br />
by concession grantor<br />
and local authorities<br />
Investment grant<br />
Investment grant<br />
Nil<br />
Infrastructure returned<br />
to grantor at end of<br />
concession for no<br />
consideration<br />
Infrastructure returned<br />
to grantor at end of<br />
concession for no<br />
consideration<br />
Infrastructure returned<br />
to grantor at end of<br />
concession for no<br />
consideration<br />
Infrastructure returned<br />
to grantor for no<br />
consideration at the end<br />
of the contract<br />
2061<br />
2045<br />
2040<br />
Bifurcated model:<br />
intangible asset and<br />
financial asset<br />
Bifurcated model:<br />
intangible asset and<br />
financial asset<br />
Bifurcated model:<br />
intangible asset and<br />
financial asset<br />
2043 Financial asset<br />
CONSOLIDATED FINANCIAL STATEMENTS 273