24.12.2014 Views

2013-vinci-annual-report

2013-vinci-annual-report

2013-vinci-annual-report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

26. Concession and PPP contracts of companies accounted<br />

for under the equity method<br />

26.1 Main features of concession and PPP contracts<br />

The features of the main or new concession or public-private partnership contracts operated by companies accounted for under the equity<br />

method are shown below:<br />

Control and regulation<br />

of prices by<br />

concession grantor<br />

Remuneration paid<br />

by<br />

Motorway and road infrastructure (including bridges and tunnels)<br />

Grant or guarantee<br />

from concession<br />

grantor<br />

Residual value<br />

Concession end<br />

date<br />

Accounting model<br />

A5 Malsch-Offenburg<br />

A-Modell<br />

(60 km to be renovated,<br />

including 41.5 km to be<br />

widened to 2x3 lanes)<br />

(Germany)<br />

Inflation-linked price<br />

increases based on the<br />

2009 toll level (excluding<br />

increases decided by<br />

grantor). Impact of<br />

environmental<br />

regulations on tariffs<br />

(with traffic level risk)<br />

Heavy vehicle users<br />

through the tolls<br />

levied by grantor<br />

Nil<br />

Infrastructure returned<br />

to grantor at end of<br />

concession for no<br />

consideration<br />

2039 Intangible asset<br />

Hounslow<br />

Rehabilitation and<br />

maintenance of roadways,<br />

traffic signs and lighting<br />

(UK)<br />

Fee paid by grantor<br />

(with no traffic level<br />

risk)<br />

Grantor<br />

Nil<br />

Infrastructure returned<br />

to grantor at end of<br />

concession for no<br />

consideration<br />

2037 Financial asset<br />

Isle of Wight<br />

Rehabilitation and<br />

maintenance of roadways,<br />

traffic signs and lighting<br />

(UK)<br />

Annual fee paid by<br />

grantor (with no traffic<br />

level risk)<br />

Grantor<br />

Investment grant<br />

Infrastructure returned<br />

to grantor at end of<br />

concession for no<br />

consideration<br />

2038 Financial asset<br />

Granvia (R1 expressway)<br />

(Slovakia)<br />

Annual fee paid by<br />

grantor (with no traffic<br />

level risk)<br />

Grantor<br />

Nil<br />

Infrastructure returned<br />

to grantor at end of<br />

concession for no<br />

consideration<br />

2041 Financial asset<br />

Ohio River Bridges East<br />

End Crossing<br />

Bridge over the Ohio River<br />

and access tunnel<br />

(USA)<br />

Annual fee paid by<br />

grantor (with no traffic<br />

level risk)<br />

Grantor<br />

Investment grant<br />

Infrastructure returned<br />

to grantor for no<br />

consideration at the end<br />

of the contract.<br />

2051 Financial asset<br />

Olympia Odos<br />

Toll motorway connecting<br />

Elefsina, Corinth, Patras<br />

and Tsakona<br />

(Greece)<br />

Pricing law as defined in<br />

the concession contract.<br />

Price increases possible<br />

subject to a price limit<br />

(with traffic level risk)<br />

Users<br />

Investment grant<br />

Infrastructure returned<br />

to grantor for no<br />

consideration at the end<br />

of the contract.<br />

2038<br />

Bifurcated model:<br />

intangible asset and<br />

financial asset<br />

Railway infrastructure<br />

South Europe Atlantic<br />

high-speed rail line<br />

High-speed rail link<br />

between Tours and<br />

Bordeaux (303 km)<br />

(France)<br />

Stadium<br />

Stade Bordeaux<br />

Atlantique<br />

(France)<br />

Société Dunkerque<br />

Aréna<br />

(France)<br />

Other<br />

BAMEO<br />

Dams on the River Meuse<br />

in France<br />

Inflation-linked price<br />

increases (with traffic<br />

level risk)<br />

Rent paid by grantor<br />

and ancillary<br />

commercial revenue<br />

Rent paid by grantor<br />

and ancillary<br />

commercial revenue<br />

Rent paid by grantor<br />

(with no traffic level<br />

risk)<br />

Pricing law defined in<br />

the concession<br />

contract (on the basis<br />

of train kilometre and<br />

slot kilometre)<br />

Grantor, private<br />

partners<br />

Grantor, private<br />

partners<br />

Grantor<br />

Investment grant paid<br />

by concession grantor<br />

and local authorities<br />

Investment grant<br />

Investment grant<br />

Nil<br />

Infrastructure returned<br />

to grantor at end of<br />

concession for no<br />

consideration<br />

Infrastructure returned<br />

to grantor at end of<br />

concession for no<br />

consideration<br />

Infrastructure returned<br />

to grantor at end of<br />

concession for no<br />

consideration<br />

Infrastructure returned<br />

to grantor for no<br />

consideration at the end<br />

of the contract<br />

2061<br />

2045<br />

2040<br />

Bifurcated model:<br />

intangible asset and<br />

financial asset<br />

Bifurcated model:<br />

intangible asset and<br />

financial asset<br />

Bifurcated model:<br />

intangible asset and<br />

financial asset<br />

2043 Financial asset<br />

CONSOLIDATED FINANCIAL STATEMENTS 273

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!