250<br />
BUSINESS UNITS IN 15 COUNTRIES<br />
MAKE UP THE OMEXOM NETWORK,<br />
WHICH SPECIALISES IN ENERGY<br />
INFRASTRUCTURE.<br />
CONTRACTING / VINCI ENERGIES 77<br />
03<br />
02<br />
This trend was particularly noticeable<br />
in Germany, where major HV line construction<br />
projects were postponed.<br />
Business was brisk in the offshore wind<br />
farm infrastructure segment, with the<br />
construction of 90 km of lines connecting<br />
these facilities to the German grid. In<br />
France, LV and MV works held steady,<br />
making up for the contraction in the HV<br />
sector. In addition to the recurring work<br />
carried out for RTE, VINCI Energies is<br />
involved in the national operator’s smart<br />
grid projects and in particular in the<br />
deployment of new-generation smart<br />
substations.<br />
In France, VINCI Energies also performs<br />
a substantial amount of work upstream of<br />
the grids, in nuclear generation. Its<br />
business units generated revenue of<br />
€240 million in this sector. They supported<br />
EDF and other companies in maintaining<br />
and upgrading the safety of<br />
existing power plants and sites and in<br />
building new facilities, including the<br />
Flamanville EPR in northern France and<br />
the Jules Horowitz reactor at Cadarache<br />
in southern France.<br />
Outside Europe, business was boosted by<br />
the increasing demand for electrical<br />
energy. This was especially true in Morocco<br />
(large number of rural electrification projects),<br />
the Democratic Republic of the<br />
Congo (secure electricity supply in the<br />
mining complexes of the Kolwezi region),<br />
Côte d’Ivoire (100 MW power plant in<br />
Abidjan) and Mozambique (refurbishment<br />
of two hydroelectric plants). In the Middle<br />
East, VINCI Energies signed a four-year<br />
contract to maintain 900 km of lines as part<br />
of the VHV interconnection grid in the<br />
countries of the Gulf. Also noteworthy, in<br />
Asia, were the construction of VHV transformers<br />
in Indonesia and the contract to<br />
provide high technical content services at<br />
the Ling Ao nuclear plant in China.<br />
In renewable energy, the 12 MWp<br />
Estézargues photovoltaic plant was commissioned<br />
in the Gard region in France, as<br />
was the Balikesir wind farm (52 turbines<br />
with unit capacities of 3 MW) in Turkey.<br />
In urban lighting, a business activity primarily<br />
focused on France, the business<br />
units of the Citeos network increased their<br />
revenue despite spending cuts by local