24.12.2014 Views

2013-vinci-annual-report

2013-vinci-annual-report

2013-vinci-annual-report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

01 Substantial efforts were made to<br />

diversify the activities and income of<br />

the MMArena. The venue hosted some<br />

50 events in <strong>2013</strong>.<br />

02 The Allianz Riviera offers spectators<br />

large service areas (snack bars, retail<br />

outlets).<br />

03 VINCI Airports has a proactive<br />

operating policy in terms of developing<br />

air transport routes and traffic and<br />

providing services in terminals.<br />

04 The manually operated dams<br />

on the Aisne and Meuse rivers will<br />

be automated under a partnership<br />

contract.<br />

68 CONCESSIONS / VINCI CONCESSIONS<br />

01<br />

02<br />

are already working actively on preparing<br />

the operating phase of the stadium: search<br />

for partners and a “namer”, programming,<br />

marketing of facilities, etc.<br />

Dunkirk arena. VINCI Concessions signed a<br />

partnership spanning 27 years with the<br />

Dunkirk urban community in October 2012<br />

for construction and operation of the future<br />

Dunkirk arena. This stadium, which caters<br />

for a wide variety of events thanks to a<br />

modular configuration welcoming from<br />

1,200 to 10,700 spectators, will host two<br />

user clubs (the USDK handball club and the<br />

BCM basketball club) while also serving as<br />

a new entertainment and cultural venue for<br />

Dunkirk and the surrounding region.<br />

The project accounts for a total investment<br />

of €112 million. The works, to be carried out<br />

by VINCI Construction France in partnership<br />

with local companies, will start in 2014<br />

and are expected to last 36 months.<br />

Stadiums in operation<br />

Allianz Riviera, Nice. The first of the two<br />

new stadiums to be completed by VINCI<br />

Concessions in the run-up to the Uefa Euro<br />

2016 championship, the Allianz Riviera was<br />

opened in September <strong>2013</strong>. Built in the<br />

record time of 25 months, it employed all<br />

VINCI’s business lines under the programme<br />

management of Nice Eco Stadium,<br />

the VINCI Concessions subsidiary responsible<br />

for building and subsequently operating<br />

the infrastructure under a 30-year<br />

partnership contract. The adjacent 30,000<br />

sq. metre shopping centre to be developed<br />

by VINCI Immobilier and Adim (VINCI<br />

Construction France) will add to its<br />

attractiveness.<br />

The Allianz Riviera, which has 7,000 sq.<br />

metres of solar panels, is the first energypositive<br />

stadium to be completed for the<br />

Uefa Euro 2016. It stands out for its ambitious<br />

architecture, designed by Wilmotte &<br />

Associés, and the translucent lattice-work<br />

timber and steel structure enveloping the<br />

stadium. It features open, fluid spaces and<br />

many services: themed catering areas,<br />

3G-4G connectivity (25,000 simultaneous<br />

connections possible), and more. The operating<br />

model is based on diversifying income<br />

streams generated on top of the resident<br />

club matches (OGC Nice): Toulon Rugby Club<br />

matches, concerts, big shows, corporate<br />

events and partnerships, including the<br />

naming contract with Allianz. With a<br />

seating capacity of 35,000 (42,000 in concert<br />

configuration), the Allianz Riviera welcomed<br />

more than 250,000 spectators during the<br />

first three months of operation in <strong>2013</strong>.<br />

Stade de France. This stadium was the<br />

Group’s first experience in managing large<br />

multi-purpose venues. Operated by a consortium<br />

in which VINCI Concessions has a<br />

67% interest, it hosted 25 high-profile and<br />

varied events (football, rugby, athletic meets<br />

and concerts) that attracted a total of<br />

1,600,000 spectators in <strong>2013</strong>. Highlights of<br />

the year included the signature of two agreements:<br />

one with the French government,<br />

1.6 million<br />

SPECTATORS WELCOMED AT THE STADE DE<br />

FRANCE IN <strong>2013</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!