elTRID Approval and Implementation<br />
The Act includes specific instructions as to<br />
<strong>the</strong> process <strong>of</strong> advancing a TRID from a<br />
redevelopment concept around a transit<br />
<strong>station</strong> to implementation <strong>of</strong> <strong>the</strong> proposed<br />
value capture strategy and eventual<br />
financing <strong>of</strong> specific improvements. Once a<br />
location is identified, <strong>the</strong> process <strong>of</strong> planning,<br />
program management/implementation and<br />
execution <strong>of</strong> <strong>the</strong> TRID begins over 16<br />
defined steps. 10 Some <strong>of</strong> <strong>the</strong>se steps occur<br />
concurrently. elTRID represents <strong>the</strong><br />
required Planning Study and includes a<br />
detailed discussion <strong>of</strong> future implementation<br />
through <strong>the</strong> Value Capture Strategy outlined<br />
above.<br />
Planning<br />
Step 1 – <strong>City</strong> and PAAC agreed to work<br />
cooperatively to create a TRID (in<br />
conjunction with o<strong>the</strong>r agencies on<br />
Steering Committee)<br />
Step 2 – <strong>City</strong> selected Project Team for<br />
elTRID Planning Study to determine<br />
location, boundaries, and rationale<br />
Step 3 – <strong>City</strong> and PAAC conducted<br />
community public meeting on elTRID<br />
facilitated by Project Team<br />
10 Sources: Implementing Transit-Oriented Development in<br />
Pennsylvania, Delaware Valley Planning Commission (2005)<br />
and Implementing Transit Revitalization Investment Districts<br />
in Philadelphia, Econsult Corporation (2008). Revised in<br />
accordance with anticipated local implementation process<br />
based upon local TIF policies.<br />
Step 4 – elTRID is circulated to<br />
Steering Committee, revised and<br />
completed<br />
Step 5 – <strong>City</strong> (through <strong>the</strong><br />
Department <strong>of</strong> <strong>City</strong> Planning) and<br />
PAAC accept elTRID’s findings and<br />
recommendations<br />
Management and Implementation<br />
Step 6 – <strong>City</strong> and PAAC hold a<br />
public meeting on elTRID Value<br />
Capture Strategy and Phase I<br />
improvements<br />
Step 7 – <strong>City</strong> and PAAC coordinate<br />
with PPSD and <strong>the</strong> County on<br />
elTRID Value Capture Strategy<br />
(three taxing bodies authorize<br />
elTRID Resolutions)<br />
Step 8 – <strong>City</strong> forms elTRIDRA within<br />
<strong>the</strong> URA to administer elTRID<br />
implementation<br />
Step 9 – <strong>City</strong>, PPSD, County, URA,<br />
PAAC and elTRIDRA execute<br />
elTRID Cooperation Agreement and<br />
Tax Fund Agreements<br />
Execution<br />
Step 10 – elTRIDRA markets<br />
development sites and commences<br />
project review for specific<br />
redevelopment projects<br />
Step 11 – elTRIDRA prepares project<br />
lists <strong>of</strong> public sector infrastructure<br />
improvements, including costs,<br />
phasing and maintenance based on<br />
findings <strong>of</strong> elTRID<br />
Step 12 – Development proposals<br />
accepted by elTRIDRA<br />
Step 13 – elTRIDRA executes<br />
Development Agreement with<br />
Developer, including elTRID<br />
financed improvements and private<br />
sector commitments - or – elTRIDRA<br />
selects contractor to complete<br />
district-wide improvements<br />
Step 14 – Project construction and<br />
completion<br />
Step 15 – elTRIDRA administers<br />
captured revenues and project<br />
expenditures from <strong>the</strong> elTRID Value<br />
Capture Fund in accordance with <strong>the</strong><br />
approved elTRID Value Capture<br />
Strategy<br />
Step 16 – Amendments to<br />
Agreement or elTRID for future<br />
phases <strong>of</strong> <strong>the</strong> value capture area<br />
Appendix VII includes a draft <strong>of</strong> <strong>the</strong><br />
cooperation agreement, including<br />
development agreement template, as<br />
referenced in this process. It is<br />
anticipated <strong>the</strong> elTRID VC Fund would<br />
be held with an escrow agent who would<br />