- Page 1 and 2:
EAST LIBERTY STATION: REALIZING THE
- Page 3 and 4:
Table of Contents EXECUTIVE SUMMARY
- Page 5 and 6:
promotion of transit oriented devel
- Page 7 and 8:
and improve environmental quality.
- Page 9 and 10:
- 163,995 SF Mixed-Use Commercial -
- Page 11 and 12:
capture to fund these improvements.
- Page 13 and 14:
13 1. TRANSIT ORIENTED DEVELOPMENT
- Page 15 and 16:
TOD Typologies In recent years CTOD
- Page 17 and 18:
4. Maximize station connectivity an
- Page 19 and 20:
Station Case Study: Del Mar Station
- Page 21 and 22:
Station Case Study: Hiawatha and La
- Page 24 and 25:
24 Shady Avenue East Liberty TRID S
- Page 26 and 27:
26 Population Density along the Eas
- Page 28 and 29:
28 Classifying East Liberty Station
- Page 30 and 31:
30 Downtown 6,675 people 48,889 job
- Page 32 and 33:
32 EAST LIBERTY STATION WALKING-SHE
- Page 34 and 35:
34 East Liberty & the TOD principle
- Page 36 and 37:
36 4. Maximize station connectivity
- Page 38 and 39:
38 6. Manage parking effectively. T
- Page 40 and 41:
40 Transportation Analysis Issues a
- Page 42 and 43:
EAST LIBERTY LAND USE 42 Key Commer
- Page 44 and 45:
Study Area City of Pittsburgh 44 To
- Page 46 and 47:
46 Zoning Analysis The zoning aroun
- Page 48 and 49:
EAST LIBERTY 2010 COMMUNITY PLAN: D
- Page 50 and 51:
50 Development Guidelines for the C
- Page 52 and 53:
52 Source: ELDI 2010 East Liberty C
- Page 54 and 55:
54 Around the same time as Eastside
- Page 56 and 57:
56 Market Conditions Commercial: Ea
- Page 58 and 59:
58 along Center Avenue dominate the
- Page 60 and 61:
3. TRID RECOMMENDATIONS East Libert
- Page 62 and 63:
APPLYING THE TOD PRINCIPLES TO EAST
- Page 64 and 65:
64 Recommended Infrastructure Impro
- Page 66 and 67:
66 EAST LIBERTY STATION IMPROVEMENT
- Page 69 and 70:
Reconfiguring the Station for Conne
- Page 71 and 72:
A New Gateway to East Liberty and t
- Page 73 and 74:
Connecting East Liberty and Shadysi
- Page 75 and 76:
75 East Liberty Station Redesign: P
- Page 77 and 78:
Near-term: Intersection improvement
- Page 79 and 80:
in diameter to accommodate forecast
- Page 81 and 82:
IMPLEMENTING PREVIOUSLY IDENTIFIED
- Page 83 and 84:
TRANSIT ORIENTED DEVELOPMENT SITE I
- Page 85 and 86:
Retail Office Hotel Housing Parking
- Page 87 and 88:
Existing Zoning and TOD While the e
- Page 89 and 90:
THE PROPOSED TRID BOUNDARY The iden
- Page 91 and 92:
PROPOSED TRID BOUNDARY & PHASING Ye
- Page 93 and 94:
an extended Ellsworth Avenue corrid
- Page 95 and 96: DRAFT Financing TOD Urban, mixed-us
- Page 97 and 98: established mechanism of municipal
- Page 99 and 100: infrastructure for Eastside III & I
- Page 101 and 102: Strategy for Future Phases As revit
- Page 103 and 104: would As mentioned, serve a there d
- Page 105 and 106: elTRID Approval and Implementation
- Page 107 and 108: Appendix I - elTRID Total Annual TR
- Page 109 and 110: Appendix II - elTRID Real Property
- Page 111 and 112: Appendix II - elTRID Potential TRID
- Page 113 and 114: Appendix II - elTRID Potential TRID
- Page 115 and 116: Appendix III - elTRID Private Devel
- Page 117 and 118: Appendix III - elTRID Pledged Real
- Page 119 and 120: Appendix III - elTRID TRID Fund Bal
- Page 121 and 122: Appendix IV - elTRID Real Property
- Page 123 and 124: Appendix IV - elTRID Potenital TRID
- Page 125 and 126: Appendix IV - elTRID Potential TRID
- Page 127 and 128: Appendix V - elTRID Pledged Real Pr
- Page 129 and 130: Appendix V - elTRID TRID Fund Balan
- Page 131 and 132: Appendix VI - elTRID Real Property
- Page 133 and 134: Appendix VI - elTRID Pledged Income
- Page 135 and 136: Appendix VII - elTRID FUNDING AND D
- Page 137 and 138: “Construction Agreements” means
- Page 139 and 140: principal invested or any penalty f
- Page 141 and 142: developer shall timely honor all re
- Page 143 and 144: LIABILITY OF THE COMMONWEALTH OF PE
- Page 145: (b) Private developer shall abandon
- Page 149 and 150: EXHIBIT B REQUISITION FORM