east liberty station: realizing the potential - City of Pittsburgh
east liberty station: realizing the potential - City of Pittsburgh
east liberty station: realizing the potential - City of Pittsburgh
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
94<br />
ESTIMATED ASSESSED VALUE<br />
Incremental Growth<br />
Boundary 1 Base<br />
Boundary 2 Base<br />
Boundary 3 Base<br />
Boundary 3 Base<br />
(w/ boundary 1 removed)<br />
Boundary 3 Base<br />
(w/ boundary 2 removed)<br />
The graphs on this page illustrate<br />
<strong>the</strong> assessed value growth over<br />
time along with projected real<br />
property tax increments that would<br />
be available for <strong>the</strong> elTRID value<br />
capture. Approximately $125 million<br />
<strong>of</strong> incremental assessed value<br />
would be created by <strong>the</strong><br />
development program at <strong>the</strong> peak <strong>of</strong><br />
<strong>the</strong> third TRID Boundary. The newly<br />
created value represents a 20%<br />
increase over <strong>the</strong> base assessed<br />
value <strong>of</strong> <strong>the</strong> largest district<br />
boundary. Within <strong>the</strong> half-mile<br />
study area, new incremental value<br />
created in <strong>the</strong> TRID Boundary would<br />
represent an approximately 33%<br />
increase in total assessed value<br />
after all value capture areas within<br />
<strong>the</strong> district expire.<br />
PROJECTED REAL PROPERTY TAX REVENUES<br />
Projected Taxes<br />
Base Taxes<br />
Incremental Taxes<br />
Annual incremental real property tax<br />
revenue <strong>of</strong> $3.8 million would be<br />
generated by this increase in<br />
assessed value during <strong>the</strong> peak.<br />
Approximate $62 million <strong>of</strong><br />
incremental revenues would be<br />
generated by new projects within<br />
<strong>the</strong> TRID Boundary over 30 years if<br />
<strong>the</strong> value capture area is phased<br />
over time. A portion <strong>of</strong> <strong>the</strong>se new<br />
revenues would be diverted to fund<br />
specific project infrastructure or<br />
district wide improvements as later<br />
outlined in <strong>the</strong> elTRID<br />
comprehensive value capture<br />
strategy.