64<br />
Recommended Infrastructure<br />
Improvements<br />
Recommended public infrastructure and<br />
transit improvements focus on application <strong>of</strong><br />
<strong>the</strong> TOD principles within <strong>the</strong> elTRID study<br />
area. The busway and East Liberty <strong>station</strong><br />
are existing transit assets that must be<br />
enhanced as <strong>the</strong> focus <strong>of</strong> <strong>the</strong> strategy to<br />
facilitate TOD. Areas outside <strong>of</strong> <strong>the</strong><br />
immediate <strong>station</strong> vicinity should also<br />
incorporate <strong>the</strong>se guidelines to fur<strong>the</strong>r efforts<br />
to recreate a truly urban setting.<br />
Investments outlined in this report are<br />
necessary to foster revitalization led by key<br />
TOD opportunities.<br />
The major infrastructure projects identified in<br />
this section are primarily proposals already<br />
envisioned in <strong>the</strong> current planning for <strong>the</strong><br />
neighborhood. These key improvements<br />
were also vetted with <strong>the</strong> public and various<br />
stakeholders through <strong>the</strong> planning process.<br />
Recommendations focus both on districtwide<br />
improvements and those necessary for<br />
specific <strong>potential</strong> TOD sites. Reconstruction<br />
<strong>of</strong> <strong>the</strong> urban fabric will facilitate an estimated<br />
$280 million <strong>of</strong> dense, mixed-use<br />
development in <strong>the</strong> study area.<br />
As <strong>of</strong>ten occurs with urban projects, large<br />
scale redevelopment efforts will require new<br />
infrastructure or significant enhancements.<br />
These sites will require public improvements<br />
such as structured parking, internal street<br />
networks and utility upgrades. elTRID<br />
identifies impediments to <strong>the</strong>se specific sites<br />
that are most conducive to TOD and<br />
provides conceptual designs <strong>of</strong> <strong>the</strong> <strong>station</strong><br />
area.<br />
ESTIMATED INFRASTRUCTURE COSTS<br />
East Liberty TRID<br />
Infrastructure Investments<br />
Estimated<br />
Project Cost Time Project Specific or VC Fund<br />
Eastside Structured Parking Facility 13,036,175 1-5 Part <strong>of</strong> Eastside project costs.<br />
Eastside TOD Infrastructure tbd 1-5 Part <strong>of</strong> Eastside project costs.<br />
Pedestrian Plaza, Ramp Conversion<br />
East Liberty Station Improvements tbd 1-5 Part <strong>of</strong> Eastside project costs.<br />
St Peter & Paul Demolition tbd 1-5 Could be tied to a specific future project<br />
83-S-243<br />
or through <strong>the</strong> value capture funds.<br />
Adaptive Signalization 250,000 1-5 Value Capture Funds<br />
Penn Circle Conversion tbd 10-15 Could be tied to a specific future project<br />
or through <strong>the</strong> value capture funds.<br />
Reizenstein-BkSq Phase II infrastructure 8,000,000 1-5 Part <strong>of</strong> BkSq Phase II project<br />
Broad Street Conversion tbd 5-10 Value capture funds.<br />
Lairmer Avenue Park tbd 5-10 Could be tied to <strong>the</strong> project or through<br />
<strong>the</strong> value capture funds.<br />
Lairmer Ave Development Infrastructure tbd 5-10 Could be tied to <strong>the</strong> project or through<br />
<strong>the</strong> value capture funds.<br />
Site Assemblege and Remediation tbd 5-20 Could be tied to a specific future project<br />
or through <strong>the</strong> value capture funds.<br />
Town Square Plan Implementation 600,000 1-5 Value capture funds or possibily tied to<br />
ELDIs projects.<br />
Broad Street Plaza 1,000,000 1-5<br />
Bicycle Lanes & Amenities tbd 1-20 Could be tied to a specific future project<br />
or through <strong>the</strong> value capture funds.<br />
General Streetscape & Pedestrian tbd 1-20 Could be tied to a specific future project<br />
Improvements<br />
or through <strong>the</strong> value capture funds.<br />
Parking Benefits District 750,000 1-10 Combination <strong>of</strong> ELDI projects and<br />
Pricing & Mgmt Strategy (Kiosks)<br />
general value capture.<br />
PAAC Maintenance Fund tbd 1-20 Specific for Eastside infrastructure but<br />
also portion <strong>of</strong> value capture.<br />
PAAC Infrastructure tbd 1-10 Could be tied to a specific future project<br />
Signage, Tech Upgrades, Shelters<br />
or through <strong>the</strong> value capture funds.<br />
Total (known costs) 23,636,175