Project & Location<br />

Construction of Earthen Dam including Spillway stilling<br />

Basin divide wall, Appraoch and Tail Channel of Jigaon<br />

Project Tal. Nandur Dist. Buldana, Maharashtra<br />

Value of<br />

Project<br />

(`in lakhs)<br />

Nature of Contract<br />

32,000.00 Contract awarded to<br />

PVRPL - <strong>APR</strong>CL JV<br />

which was subcontracted<br />

to <strong>APR</strong>CL<br />

1,472.95 Direct Contract to<br />

<strong>APR</strong>CL<br />

1,596.98 Direct Contract to<br />

<strong>APR</strong>CL<br />

Value of<br />

Project yet<br />

to be<br />

executed<br />

(` Lakhs)<br />

29,733.77<br />

Construction of Earthwork Structures and CC lining of<br />

200.88*<br />

Belkhedi Distributory from km 0 to 34, Madhya Pradesh<br />

Construction of Earthwork Structures and CC lining of<br />

394.91<br />

Pipariya Sub Distributory from KM 0.00 to 12.0 and<br />

Belkedi Distributory tail Minor KM 0.00 to 15.00 KM &<br />

its sub minors in Jabalpur Dist., Madhya Pradesh<br />

Construction of Earth work, C.C.Lining and inline 4,000.98 Direct Contract to 465.34<br />

Structure of Majholi Branch Canal Km.0.00 to 16.50 Km<br />

<strong>APR</strong>CL<br />

and its distribution systems off taking from Km 99.775 of<br />

Right Bank Main Canal in Jabalpur Dist., Madhya<br />

Pradesh.<br />

Construction of Balance work of Madna Distributory and 3,247.80 Direct Contract to 232.72<br />

its distribution network system of Bargi Diversion<br />

<strong>APR</strong>CL<br />

Project, Madhya Pradesh.<br />

Execution of the Bargi Right Bank Canal from R.D. 129 13,876.00 Contract awarded to 7,176.93<br />

Km. to R.D. 154 Km. of Bargi Diversion Project. On<br />

<strong>APR</strong>CL-JTEGC JV<br />

TURNKEY Basis construction of lined TUNNEL (about<br />

which was subcontracted<br />

650 m. in length, about 10 m. diameter) with cut and<br />

to <strong>APR</strong>CL<br />

cover RCC transitions (about 75 m. length), constructions<br />

of canals (about 25 km. in length), Madhya Pradesh.<br />

Construction of Bridge Cum Barrage across river Manjra 4,277.58 Direct Contract to 1,310.53*<br />

near Jirgiyal in Bidar District, Karnataka.<br />

<strong>APR</strong>CL<br />

<strong>Constructions</strong> of (M.I. Tank) Bund, Waste Weir & 388.21 Direct Contract to 232.91<br />

Canals Near Antravalli in Ranebennur Taluk Haveri<br />

<strong>APR</strong>CL<br />

District, Karnataka.<br />

TOTAL 1,80,053.30 1,20,573.02<br />

* Represents portion of completed projects for which bills are yet to be raised.<br />

Railways<br />

Our Company ventured into Railways Segment in the year 2007. With government thrust on infrastructure spending<br />

and policy initiatives undertaken by the Railway Ministry we feel that Railways is one of the promising areas for<br />

growth in the near future. Our Company operates in Railways segment by offering a gamut of services as described<br />

below –<br />

Formation of Railway embankment to the required gradation and height<br />

Construction of structures for crossing of drains and rivers<br />

Collection and spreading of ballast on the embankment<br />

Erection of railway tracks with the rails supplied by the department<br />

Construction of railway platforms, staff quarters and buildings<br />

Electrification and signaling work<br />

Our major client in this segment is Rail Vikas Nigam <strong>Limited</strong><br />

Order Book as on February 28, 2011<br />