APR Constructions Limited - Saffron Capital
APR Constructions Limited - Saffron Capital
APR Constructions Limited - Saffron Capital
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
As of February 28, 2011 our Company has an order book position of `17,786.54 Lakhs under the Railways segment.<br />
The break up is as follows –<br />
Project & Location Value of<br />
Project<br />
(` in lakhs)<br />
Construction of new B.G. Line from obulavaripalle to<br />
Krishnapatnam-Phase I works from Venkatachalam to<br />
Krishnapatnam in South Central Railway, Andhra<br />
Pradesh<br />
Earth work in formation, construction of bridges, service<br />
and residential buildings, installation of track, remodeling<br />
of station yards, General Electrical and other<br />
miscellaneous works, including supply of materials<br />
except rails and PSC line sleepers, for patch doubling of<br />
Guntakal – Raichur section of S.C Railway, Andhra<br />
Pradesh<br />
Proposed construction of new BG Line between<br />
Tindivanam and Nagari (via) Walajah Road part of work<br />
new BG Line between Walajah Road and Arcot<br />
connecting Ranipet-acrossPalar riverin Ranipet-Arcot<br />
section, Tamil Nadu<br />
Development/ Construction of Railway Yard facilities<br />
under expansion plan of SAIL-ISP near Damodar<br />
Railway station, West Bengal<br />
Tender No. CE/Con/AUB-SGUJ/MB/2008/01-Civil<br />
engineering works from Km 0 to 42 Between sillguri<br />
Junction to Galgalla (excluding) in connection with<br />
SGUJ-AUB Guage conversion project under Dy. Chief<br />
Engineer, Construction, NF Railway, New Jalpalguir,<br />
Assam<br />
Tender No. CE/Con/AUB-SGUJ/MB/2008/02-Civil<br />
engineering works from Km 42 to 76.2 Between Adhikari<br />
(encluding) to Alubari Roadin connection with SGUJ-<br />
AUB Gauge conversion project under Dy. Chief<br />
Engineer, Construction, NF Railway, New Jalpalguri,<br />
Assam<br />
Earthwork and Minor Bridges from Ch. 35.00 KM to Ch.<br />
44.11 in connection with construction of New Railway<br />
line from Agartala to Subroom, Tripura<br />
Construction of foundation & Substructure of 3 x 61.10M<br />
span Major Br. No. 94 on river gomti at KM 39/180 on<br />
well foundation with earthwork at bridge approaches,<br />
other protection/ancillary works in Agartala -Udaipur<br />
section, Tripura.<br />
Siliguri Junction-Construction of BG Diesel Loco Shed<br />
(I.R. & HR bay of Size 77 M x 18.10 M each) with<br />
provision movement of 10 ton and 40 ton EOT crane<br />
facility, other structures, Tripura.<br />
Siliguri Junction - Construction of DMU- Car<br />
Maintenance Shed (LR&HR bay of size 159.87m x<br />
Nature of Contract Value of<br />
Project yet<br />
to be<br />
executed (`<br />
in lakhs)<br />
20.13*<br />
4,246.22 Contract awarded to<br />
<strong>APR</strong>CL- VNR JV<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
9,399.34 Contract awarded to<br />
<strong>APR</strong>CL- MVR JV<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
2,804.75 Contract awarded to<br />
<strong>APR</strong>CL- KS JV<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
5,361.06 Contract awarded to<br />
<strong>APR</strong>CL- VNR JV<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
8,652.55 Contract awarded to<br />
<strong>APR</strong>CL- VNR JV<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
8,280.99 Contract awarded to<br />
<strong>APR</strong>CL- VNR JV<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
2,313.23 Contract awarded to<br />
<strong>APR</strong>CL- VNR JV<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
1,522.87 Contract awarded to<br />
<strong>APR</strong>CL- VNR JV<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
1,268.95 Contract awarded to<br />
<strong>APR</strong>CL- VNR JV<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
1,000.25 Contract awarded to<br />
<strong>APR</strong>CL- VNR JV<br />
4,197.68<br />
1,489.73<br />
2,862.25<br />
753.72<br />
3,048.38<br />
1,874.72<br />
1,399.36<br />
1,228.64<br />
594.96<br />
104