Infrastructure facilities<br />

The main utilities required in the construction activity are:<br />

Power:<br />

Power requirement depends upon the size and nature of the project. Power is required at site for running various<br />

equipments and lighting. Power requirement at sites is met by running Diesel Generator sets. The power requirement<br />

at the crusher plant is met by supply of electricity from Diesel Generator Sets owned by our Company and the local<br />

electricity supply channel.<br />

Fuel:<br />

The fuel required is met by supplies from the local depot / markets.<br />

Water:<br />

Our Company meets its water requirement through local supplies and bore wells.<br />

Raw Materials<br />

Our Company doesn‟t have any identified source of raw material or a firm contract with any supplier of raw<br />

materials. The major raw material for projects undertaken by our Company are boulders, stone aggregates, cement,<br />

steel, bitumen, sand, fuel and water. The Commercial & Purchases department in conjunction with the Projects<br />

Management team draws up the raw material delivery schedule and places orders with the shortlisted vendors. Short<br />

fall in raw materials or urgent requirement, if any is sourced from local markets.<br />

Plant and machinery<br />

Infrastructure industry requires varied equipment for execution of projects. Our Company has invested in equipment<br />

like crushing plants, batching plants, transit mixers, concrete pumps, mechanical pavers, excavators / back hoe<br />

loaders, soil compactors and cranes. Equipment requirement for projects under execution are met mainly through our<br />

own equipment bank. As on November 30, 2010 our Company‟s investment into fixed assets has been ` 4,377.42<br />

Lakhs (net of accumulated depreciation). Our Company has been investing into equipment as per business<br />

requirements. With diversification and increased order book position we have expanded our equipment bank.<br />

Details of our crushing plants<br />

Crushing Plant Location Capacity (Ton per Hour)<br />

1 Adoni, Andhra Pradesh 175<br />

2 Nellore, Andhra Pradesh 100<br />

3 Katni, Madhya Pradesh 175<br />

Apart from the above mentioned Crushing plants, we have a number of critical equipment that have been classified<br />

broadly into three categories based on the usage – Concrete Works, Earth Works and Cranes.<br />

These equipment are used for all the infrastructure segments wherein we are present.<br />

A. Concrete Works:<br />

1. Batching Plant – Used to mix concrete<br />

2. Transit Mixer – To Transport the Concrete manufactured at the Batching Plant to site<br />

3. Concrete Pumps – Used for placement of manufactured Concrete<br />

4. Mechanical Paver – Used for lining of Canals<br />