Project & Location Value of<br />
Project<br />
(` in lakhs)<br />
12.7m, six coaches each) with provision for movement of<br />
2 nos of 15 ton & 40 ton EOT Crane Facility - including<br />
track linking & other related anciliary works, Tripura.<br />
Linking of BG track on PSC sleeper manually after<br />
dismantling of existing MG track including all ancilliary<br />
works between ch. 51.00 km to 70.20 km including<br />
Aluabari Road and Thakurganj StationYard in connection<br />
with Guage conversion of Aluabari Road - Siliguri<br />
Nature of Contract Value of<br />
Project yet<br />
to be<br />
executed (`<br />
in lakhs)<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
471.91 Contract awarded to<br />
<strong>APR</strong>CL- VNR JV<br />
which was subcontracted<br />
to <strong>APR</strong>CL<br />
316.97<br />
Junction - Section of NF Rly, Tripura.<br />
TOTAL 45,322.12 17,786.54<br />
* Represents portion of completed projects for which bills are yet to be raised.<br />
Industrial Infrastructure<br />
Our Company undertakes site gradation work which is an initial activity for implementing any major power project or<br />
setting up any manufacturing centre. Our Company ventured into Industrial projects in the year 1998 - 99 (under<br />
erstwhile Partnership concern) by undertaking Toyota – Kirloskar site gradation work of `153.45 lakhs cubic meters<br />
near Bangalore for their proposed car manufacturing centre.<br />
Our Company undertakes two types of site gradation works.<br />
a. Site gradation with large variations in natural ground – high mounds are cut by poclains or graders and low<br />
lying areas are filled up with excavated soils and consolidated with vibratory rollers to have a uniform level<br />
of land for the construction of factory or power plant.<br />
b. Site grading with filling up of land – the whole area of the proposed industry / power plant is filled up with<br />
borrowed earth to a height of 3 to 5 meters and consolidate the area.<br />
Our Company, with the experience of over two decades in infrastructure sector, undertakes various projects like<br />
Railway Sidings; Approach Roads; Bridges; Reservoirs & Industrial Structures under the Industrial Infrastructure<br />
sector.<br />
Our Company, through such industrial infrastructure projects, has presence into other segments of Infrastructure like<br />
Road. Our Company has experience of developing Roads which will enable us to undertake various Central or State<br />
government contracts.<br />
Our major clients in this segment are NHPC; NTPC; SAIL; National Building Construction Corporation Ltd.<br />
(NBCCL), etc.<br />
Order Book as on February 28, 2011<br />
As of February 28, 2011 our Company has an order book position of `3,260.32 Lakhs under the Industrial<br />
Infrastructure segment. The break up is as follows –<br />
Project & Location Value of Nature of Contract Value of<br />
Project<br />
Project yet<br />
(` in lakhs)<br />
to be<br />
NBCC Ltd: Site Levelling works package for Barh Super<br />
Thermal Power Project ( 3 X 600 MW) Package-II,<br />
BARH-Patna, Bihar<br />
Expansion of IISCO Steel Plant - Site Leveling works<br />
and Dressing Works in Burnpur, West Bengal.<br />
5,268.67<br />
5,232.30<br />
Direct Contract to<br />
<strong>APR</strong>CL<br />
Direct Contract to<br />
<strong>APR</strong>CL<br />
executed (`<br />
in lakhs)<br />
435.80*<br />
146.52*<br />
105