Of the two, <strong>APR</strong>CL-CRSSG (JV) was awarded the contract by Irrigation and CAD Department, Government of<br />

Andhra Pradesh for Investigation, design and 1) Earthwork, excavation of GNSS Main Canal from Km 254.000<br />

to Km 262.100 including construction of CM & CD works and 2) Excavation and lining of Balaji Tunnels – II<br />

from Km 262.100 to Km 272.800 including all allied works under GNSS in Chittor District, vide letter dated<br />

October 1, 2007.<br />

The said Joint Venture has entered in to a sub-contracting agreement dated January 24, 2008 with our Company<br />

whereby the the above contract has been sub-contracted to our Company for a commission of 0.75% on gross<br />

bills.<br />

Audited Financial Information<br />

(` lakhs)<br />

Particulars March 31, 2010 March 31, 2009 March 31, 2008<br />

Sales 0.00 0.00 42.52<br />

Other Income 0.00 0.00 0.32<br />

Net Profit (0.25) (0.36) 0.04<br />

Share <strong>Capital</strong><br />

- <strong>APR</strong>CL (0.03) 0.82 0.13<br />

- CRSSG (0.01) 0.27 0.04<br />

Loans Funds Nil Nil Nil<br />

4. JTEGC – <strong>APR</strong>CL (JV)<br />

Our Company has entered into a Joint Venture Agreement dated February 05, 2008 with M/s Jiangsu Provincial<br />

Transportation Engineering Group Co. <strong>Limited</strong> pursuant to which joint venture entity JTEGC-<strong>APR</strong>CL (JV) (in<br />

proportion of 61:39) has been formed for bidding and execution of Bargi Right Bank Canal from R.D. 129 Km to<br />

R.D. 154 Km. of Bargi Diversion Project on TURNKEY Basis comprising the work of Survey, Planning,<br />

Geotechnical Investigations, Design, Estimation, preparation of permanent land Acquisition cases, construction<br />

of lined TUNNEL (about 650 m. in length, about 10 m. diameter) with cut and cover RCC transitions (about 75<br />

m. length), constructions of canal (about 25 km. in length) by Excavation, cement concrete lining all inline<br />

structures and commissioning and testing of the canal system.<br />

JTEGC-<strong>APR</strong>CL (JV) was awarded the contract by Office of the Executive Engineer, Narmada Development<br />

Division No.5, Katni, Madhya Pradesh vide letter dated March 20, 2008.<br />

The said joint venture has entered in to a sub-contracting agreement dated March 28, 2008 with our Company<br />

whereby the entire project has been sub-contracted to our Company for a commission of 0.75% on gross bills.<br />

Audited Financial Information<br />

(` lakhs)<br />

Particulars March 31, 2010 March 31, 2009 March 31, 2008<br />

Sales 3,703.12 605.69 0.00<br />

Other Income 27.77 4.54 0.00<br />

Net Profit 24.60 4.00 (0.24)<br />

Share <strong>Capital</strong><br />

- <strong>APR</strong>CL 11.34 1.21 0.05<br />

- JTEGC 17.29 2.68 0.08<br />

Loans Funds Nil Nil Nil<br />