of the proceeds and increasing or decreasing expenditure for a particular object vis-a-vis the utilisation of the<br />

proceeds.<br />

Since the objects of the Issue are proposed to be financed out of Issue proceeds, the requirement of an undertaking<br />

confirming that firm arrangements of finance through verifiable means towards 75% of the stated means of finance,<br />

excluding the amount proposed to be raised through this Issue, is not applicable<br />

Details of use of the Issue proceeds<br />

1 Finance the procurement of construction equipment<br />

In order to meet our growth plans, our Company proposes to make substantial investments in Construction<br />

Equipment. Our Company has envisaged a capital expenditure of approximately `4,198.71 lakhs for the purchase of<br />

the Construction Equipment.<br />

We propose to add following equipment:<br />

Sr.<br />

No.<br />

Details of Equipment<br />

1 Speedcrafts Wet Mix Macadam Plant – 60 of 60 TPH capacity<br />

– Four Bin Feeder fitted with motors and Gear Box; Single<br />

Deck Vibratory Screen for removal of oversized material;<br />

Slinger conveyor for feeding cold aggregates into the pugmill;<br />

Twin shaft pugmill fitted with hydraulically operated discharge<br />

hopper; Mineral Filler fittd with rotary and blower; Water Tank<br />

fitted with flow meter; Fully insulated control cabin fitted with<br />

air conditioner and micro processor based electronic control<br />

panel<br />

2 Speedcrafts Wet Mix Macadam Plant – 160 of 160 TPH<br />

capacity – Four Bin Feeder fitted with motors and Gear Box;<br />

Single Deck Vibratory Screen for removal of oversized<br />

material; Slinger conveyor for feeding cold aggregates into the<br />

pugmill; Twin shaft pugmill fitted with hydraulically operated<br />

discharge hopper; Mineral Filler fittd with rotary and blower;<br />

Water Tank fitted with flow meter; Fully insulated control<br />

cabin fitted with air conditioner and micro processor based<br />

electronic control panel<br />

3 500 KVA Diesel Generation Set – Diesel Generating Set rated<br />

@ 1500 rpm, 0.8 power factor, 415 V, 3 phase, 50 Hz,<br />

consisting of Diesel Engine; Alternator; Control Panel and<br />

Acoustic Enclousre<br />

4 125 kVA GREAVESPOWER Sound-Proof DG Set powered<br />

by Greaves 4G11TAG3 Engine – Direct injection, 4 cyclinder,<br />

water cooled, compression ignited, turbo-charged, charge aircooled<br />

diesel engine developing 155 hp at 1500 rpm;<br />

Alternator; Control Panel and Sound proof Acoustic Enclosure<br />

5 Bomag Finisher Model BF 691 C with Crawler tracks upto a<br />

maximum width of 9200 mm (with Mechanical Extensions) at<br />

a maximum production rate of 800 tons / hr<br />

6 Bomag Pneumatic Tyre Roller Model BW 25 RH fitted with<br />

Duetz water Cooled BF4M 2012 Engine developing 74.9 KW<br />

@ 2300 rpm, having an operating weight of 8800 kg (Gross<br />

weight of 25100 kg with ballast).<br />

7 Greaves Heavy Tandem Roller Model BW 151 ADH-2 –<br />

Double Drum Vibratory Roller is a Heavy Dury Tandem<br />

59<br />

Estimated<br />

Cost (`<br />

Lakhs) *<br />

Name of the<br />

supplier<br />

43.29 Speedcrafts<br />

<strong>Limited</strong><br />

55.92 Speedcrafts<br />

<strong>Limited</strong><br />

24.75 Greaves<br />

Cotton<br />

<strong>Limited</strong><br />

18.23 Greaves<br />

Cotton<br />

<strong>Limited</strong><br />

1117.20 Greaves<br />

Cotton<br />

<strong>Limited</strong><br />

496.54 Greaves<br />

Cotton<br />

<strong>Limited</strong><br />

225.01 Greaves<br />

Cotton<br />

Date of<br />

Quotation<br />

February<br />

11, 2011<br />

February<br />

15, 2011<br />

February<br />

09, 2011<br />

February<br />

09, 2011<br />

February<br />

15, 2011<br />

February<br />

15, 2011<br />

February<br />

15, 2011